42
b
a
Z
p
p
6 - INSTALLATION AND ASSEMBLY OF BOILER
d) assembly of the right-hand side of the boiler (OBLIGATORY before connecting the boiler to the tank).
Take hold of the right-hand side "
Z
" and put it up against the boiler. The side to be used is easily recognisable because it has a hole in the
middle.
At the bottom, fit the holes in the side on the pins "
p
" of the boiler.
Содержание LOGIKA 25-35 REFILL
Страница 52: ...50 y x S v 7 INSTALLATION AND ASSEMBLY OFTANK ASSEMBLYOFSIDEPANEL MANUALTANK ...
Страница 121: ......
Страница 122: ......
Страница 123: ......