7
2-INSTALLATION INSTRUCTIONS
Technical Dept. - All rights reserved - Reproduction is prohibited
PRECAUTIONS REGARDING INSTALLATION
IMPORTANT!
Product installation and assembly must be carried out by qualified personnel.
The product must be installed in a suitable place for it to be regularly opened and routine maintenance to be performed.
The site must be:
•
compliant for proper operation.
•
Equipped with an adequate smoke expulsion system.
•
Equipped with ventilation intake from outside.
•
Equipped with 230V 50 Hz power supply with an EC compliant earth system.
The product must be connected to a chimney or vertical duct, either inside or outside, that conforms to the standards in
force. The product must be positioned in such a way that the electrical socket is accessible.
IMPORTANT!
The product must be connected to a chimney or a vertical duct that can expel the smoke at the highest point of the
building.
The fumes are however derived from the combustion of wood products, and if they come into contact with or close
to walls, they can make dirty marks. Moreover, utmost attention is required as they are almost invisible but very hot
and can cause burns. The holes of the external air inlet and the smoke outlet pipe must be drilled before positioning
the product.
THE OPERATING ENVIRONMENT
For correct operation and even distribution of heat, the product must be placed where the air required for combustion can flow.
The volume of the room should be no less than 15 m
3
These openings (air inlets) must be made in such a way that it is impossible for them to be obstructed in any way.
The air can also be taken from rooms adjacent to the one which needs ventilating, as long as they are provided with an air intake from the
outside, and are not used as bedrooms or bathrooms, and provided there is no fire risk such as there is for example in garages, woodsheds,
and storerooms where inflammable material is kept, with reference to what is laid down in current standards.
If the product is placed too close to the wall it could cause overheating and damage the plaster (yellowing, cracking,
etc.).
Содержание LOGIKA 25-35 REFILL
Страница 52: ...50 y x S v 7 INSTALLATION AND ASSEMBLY OFTANK ASSEMBLYOFSIDEPANEL MANUALTANK ...
Страница 121: ......
Страница 122: ......
Страница 123: ......