58
6
7
5
3
1
2
4
8 - ASSEMBLY OF BOILER AESTHETICS UNIT
BOILER AESTHETICS UNIT
i) hydraulic connection between tank and water mains (supply-return-sanitary-filling)
(RESPONSIBILITY OF SPECIALISED HYDRAULIC TECHNICIAN)
l) hydraulic supply to boiler and checking for leaks
(RESPONSIBILITY OF SPECIALISED HYDRAULIC TECHNICIAN).
k) assembly of aesthetics unit of boiler
After completing steps "
i
" and "
l
", assemble the aesthetics unit of the boiler.
For convenience, the panels are identified with the numbers in the picture.
Содержание LOGIKA 25-35 REFILL
Страница 52: ...50 y x S v 7 INSTALLATION AND ASSEMBLY OFTANK ASSEMBLYOFSIDEPANEL MANUALTANK ...
Страница 121: ......
Страница 122: ......
Страница 123: ......