background image

28

REC Installation Manual - REC Solar Panels  - IEC 

61215

 /

61730

Rev L 

-

 

09

.

21

 

Ref:  PM

-

IM

-20

ANNEX 

2

: INSTALLATIONS USING MODULE LEVEL POWER ELECTRONICS

This section is applicable to all REC products referred to in this installation manual.

Module Level Power Electronics (MLPE) is the name given to the range of panel-level components that can be installed in PV system circuits 

installed on or in buildings to reduce shock hazard for emergency responders. MLPE devices can be supplied pre-installed by panel manufacturers 

or as a ‘retro-fit’ system made by third-party manufacturers.
MLPE devices may be used on REC solar panels where desirable or mandatory (note that the certification testing of solar panels does not include 

testing with MLPE devices). When installing an MLPE device on an REC solar panel, follow the instructions provided by the device manufacturer and 

the instructions specific for REC solar panels given below. Failure to follow the manufacturer and the REC instructions may invalidate the warranty.

INSTALLATION
i)  Installation

•  MLPE 

devices

 are suitable for use wherever solar panels are suitable for installation. Observe any limitations set by the MLPE manufacturer. 

(e.g., minimum mounting gap between MLPE and roo

ft

op).

•  When a

tt

aching an MLPE 

device

 to a solar panel, it must be secured to the panel frame. Follow MLPE manufacturer instructions to ensure 

optimum mounting of MLPE device and prevent any slippage during operation.

•  MLPE 

devices

 may also be a

tt

ached to the mounting construction. In such cases, refer to the instructions provided by the manufacturer. 

•  Wherever possible, the installation of the MLPE device should not cover the product label on the rear of the panel. 
•  MLPE 

devices

 may only be installed on REC solar panels in the areas shown in the diagram below (fig. 

26

 & 

27

):

Fig. 

26

:  REC 

60

-cell panels MLPE device installation zones

Installation of MLPE device in the green zone is permi

tt

ed. 

Installation of MLPE device in the red zone is not permi

tt

ed.

CAUTION

•  To avoid damage to the panel and to allow for thermal expansion, there must be a minimum gap of 

0

.

1

 in (

2

.

5

 mm) between the MLPE device 

and the panel backsheet.

•  The mounting holes in the panel frame must not be used for the installation of MLPE devices.
•  The drilling of extra holes in the frame is not permi

tt

ed and will invalidate the panel warranty.

CONNECTION

•  First ensure the installation of the MLPE 

device

 is secure and safe.

•  Following the device manufacturer’s instructions to connect the cables from the MLPE 

device

 to the solar panel correctly (usually positive to 

positive [+ to +] and negative to negative [- to -]).

•  Connection to the next panel in the array should be done from the ‘free’ cables.

SAFETY

•  Immediately disconnect the device if there is a problem during installation.

Fig. 

27

:  REC 

72

-cell panels MLPE device installation zones

0 - 480 mm [0 - 18.9 in]

0 - 480 mm [0 - 18.9 in

]

0 - 1016 mm [0 - 40 in]

0 - 480 mm [0 - 18.9 in

]

0 - 480 mm [0 - 18.9 in

]

0 - 1016mm [0 - 40 in]

GR

GR

GR

0 - 650 mm [0 - 25.6 in

]

0 - 650 mm [0 - 25.6 in

]

0 - 1001 mm [0 - 39.4 in]

0 - 650 mm [0 - 25.6 in

]

0 - 650 mm [0 - 25.6 in

]

0 - 1001 mm [0 - 39.4 in]

GR

GR

GR

Содержание N-Peak 2 Black Series

Страница 1: ...ll REC solar panels certified according to IEC 61215 61730 RECTwinPeak 4 Series RECTwinPeak 4 Black Series REC N Peak Series REC N Peak Black Series REC N Peak 2 Series REC N Peak 2 Black Series REC S...

Страница 2: ...ll panels MLPE device installation zones 28 INTRODUCTION 3 SAFETY MEASURES 4 PANEL HANDLING 5 CHOOSING AN INSTALLATION LOCATION 5 ELECTRICAL INSTALLATION 6 MECHANICAL INSTALLATION 6 PANEL INSTALLATION...

Страница 3: ...lers are responsible for the following Only qualified personnel must perform work on photovoltaic systems such as installation commissioning maintenance and repairs Be sure to follow the safety instru...

Страница 4: ...served during handling to avoid the risk of sparking fire hazards burns and lethal electric shocks Exercise extreme caution when wiring panels and look out for damaged or dirty cables etc Never insert...

Страница 5: ...radationtothepackagingorpanelcomponents pallets and panels must be stored in a controlled environment ideally internal where it is protected from the elements e g rain dust and direct sunlight If over...

Страница 6: ...ion fault Correct DC polarity must be observed at all times Electrical Ratings ElectricalratingsarewithinaspecifictoleranceofmeasuredvaluesatStandardTestConditions STC asgiveninthetechnicalcharacteris...

Страница 7: ...tructions including specific hardware and torque requirements Ensure the clamps used are suitable for the planned installation and expected system design loads The grip area must not extend onto the p...

Страница 8: ...00Pa 2400Pa 3600Pa 1600Pa X 622 712 mm 2400Pa 2400Pa 1600Pa 1600Pa 2400Pa 2400Pa 1600Pa 1600Pa 2400Pa 2400Pa 1600Pa 1600Pa X 0 100 mm X 1200Pa 1200Pa 800Pa 800Pa 1600Pa 1600Pa 1066Pa 1066Pa X 100 250...

Страница 9: ...learance Gap Clamping zone 20 40 mm 40 60 mm 60 mm 20 mm Test Load DesignLoad Test Load DesignLoad Test Load DesignLoad Test Load DesignLoad 0 650 mm 1200Pa 1200Pa 800Pa 800Pa 3000Pa 2400Pa 2400Pa 160...

Страница 10: ...600Pa 1600Pa X 0 100 mm X 1200Pa 1200Pa 800Pa 800Pa 1600Pa 1600Pa 1066Pa 1066Pa X 100 250 mm X 800Pa 800Pa 533Pa 533Pa 2400Pa 2400Pa 1600Pa 1600Pa X Rail length under module 100 200 mm Min 100 mm Max...

Страница 11: ...Pa 2800Pa 1600Pa 5400Pa 2400Pa 3600Pa 1600Pa X 340 420 mm 1800Pa 1800Pa 1200Pa 1200Pa 6200Pa 4000Pa 4133Pa 2666Pa 7000Pa 4000Pa 4666Pa 2666Pa X 420 520 mm 1200Pa 1200Pa 800Pa 800Pa 3000Pa 2400Pa 2400P...

Страница 12: ...m 4 in 250 mm 9 8 in 250 mm 9 8 in 100 mm 4 in 100 mm 4 in 650 mm 25 6 in 0 0 0 0 0 0 650 mm 25 6 in Rail position Rail position Legend Clearance Gap Clamping zone 20 40 mm 40 60 mm 60 mm 20 mm Test L...

Страница 13: ...Pa 1600Pa X 0 100 mm X 1200Pa 1200Pa 800Pa 800Pa 1600Pa 1600Pa 1066Pa 1066Pa X 100 250 mm X 800Pa 800Pa 533Pa 533Pa 2400Pa 2400Pa 1600Pa 1600Pa X Rail length under module 100 200 mm Min 100 mm Max 200...

Страница 14: ...0Pa 1600Pa X 225 357 mm 1800Pa 1800Pa 1200Pa 1200Pa 4200Pa 2400Pa 2800Pa 1600Pa 5400Pa 2400Pa 3600Pa 1600Pa X 357 582 mm 1800Pa 1800Pa 1200Pa 1200Pa 6200Pa 4000Pa 4133Pa 2666Pa 7000Pa 4000Pa 4666Pa 26...

Страница 15: ...ELS WITH CONTINOUS RAILS PARALLEL TO LONG SIDE OF THE PANEL A continous rail or other support structure spans the complete underside of the panel Legend Clearance Gap Clamping zone 20 40 mm 40 60 mm 6...

Страница 16: ...357 582 mm 1200Pa 1200Pa 800Pa 800Pa 3000Pa 3000Pa 2000Pa 2000Pa 4200Pa 4000Pa 2800Pa 2666Pa X 582 622 mm 1200Pa 1200Pa 800Pa 800Pa 2400Pa 2400Pa 1600Pa 1600Pa 3600Pa 2400Pa 2400Pa 1600Pa X 622 712 mm...

Страница 17: ...s apply a safety factor of 1 5 to the stated test load e g test load 5400 Pa 1 5 3600 Pa design load Part Name Material Rail 6105 T5 aluminum extrusion Bolt M6 x 25 drop inT stud kit Nut M6 flanged he...

Страница 18: ...d the short side as shown in fig 16 and can be further identified by the grounding symbol stamped in the frame next to it Check all applicable requirements before beginning installation Suitable groun...

Страница 19: ...lestandards e g IEC 62852orUL6703 toensuretheyarefitforpurposeandsafety Useofanychemicalsorlubricantsontheconnectorsorcontactsmayonlybecarriedoutinlinewiththeconnectormanufacturer sinstructions TheREC...

Страница 20: ...to local guidelines and regulations By ensuring REC solar panels are disposed of correctly you will help prevent potential negative impact on the environment and human health The majority of the panel...

Страница 21: ...3 34 7 35 0 NominalPowerCurrent IMPP A 10 62 10 65 10 68 10 72 OpenCircuitVoltage VOC V 40 6 40 8 41 0 41 2 ShortCircuitCurrent ISC A 11 26 11 32 11 38 11 45 PanelEfficiency 19 7 20 0 20 3 20 5 Values...

Страница 22: ...34 3 34 7 NominalPowerCurrent IMPP A 10 60 10 62 10 65 10 68 OpenCircuitVoltage VOC V 40 5 40 6 40 8 41 0 ShortCircuitCurrent ISC A 11 19 11 26 11 32 11 38 PanelEfficiency 19 4 19 7 20 0 20 3 Values...

Страница 23: ...ncy 18 3 18 6 18 9 19 2 19 5 19 8 Values at standard test conditions STC air mass AM 1 5 irradiance 1000 W m temperature 25 C based on a production spread with a toleranceofPMAX VOC ISC 3 withinonewat...

Страница 24: ...10 28 PanelEfficiency 18 3 18 6 18 9 19 2 19 5 Values at standard test conditions STC air mass AM 1 5 irradiance 1000 W m temperature 25 C based on a production spread with a toleranceofPMAX VOC ISC 3...

Страница 25: ...ominalPowerCurrent IMPP A 10 62 10 65 10 68 10 72 OpenCircuitVoltage VOC V 40 8 40 9 41 1 41 3 ShortCircuitCurrent ISC A 11 31 11 36 11 41 11 46 PanelEfficiency 19 7 20 0 20 3 20 5 Values at standard...

Страница 26: ...VMPP V 33 5 33 9 34 3 34 7 NominalPowerCurrent IMPP A 10 60 10 62 10 65 10 68 OpenCircuitVoltage VOC V 40 7 40 8 40 9 41 1 ShortCircuitCurrent ISC A 11 27 11 31 11 36 11 41 PanelEfficiency 19 4 19 7...

Страница 27: ...slack to prevent damage due to water level changes and wave motions ii Mounting panels Installation of REC solar panels must be in accordance with the aforementioned standard mounting instructions Th...

Страница 28: ...MLPE devices may also be attached to the mounting construction In such cases refer to the instructions provided by the manufacturer Wherever possible the installation of the MLPE device should not co...

Страница 29: ...he market of electrical equipment designed for use within certain voltage limits The technical documentation and full compliance with the standards listed below proves the conformity of the product wi...

Страница 30: ...08 2019 E Updated Datasheets 01 2020 F Updated Datasheets 06 2020 G Updated Installation Manual Layout removed REC Peak Energy Series inclusion of REC N Peak Series 09 2020 H Addition of REC TwinPeak...

Страница 31: ...RECSOLARPTE LTD 20TUASSOUTHAVENUE14 SINGAPORE637312 SINGAPORE Tel 6564959228 Mail post recgroup com www recgroup com...

Отзывы: