Pak-Blast
50 gallon
6
No. Part #
Description
Qty
1
KB2501
top link bar, standard length 16”
1
2
KB2501
top link bar, standard length 16”
1
PK302
top link bar 26” long
call
rollbar clearance top link bar
3
SGC050
sag chain
2
4
SGC051
keyhole bracket for sag chain
2
5
0620200CH5
5/8”-11 x 2” Gr.5 bolt
2
062WS
5/8” lockwasher
2
062NF
5/8”-11 nut
2
Hook-up instructions
1
Read and understand all instructions before beginning.
2
For your safety, do not make adjustments to the
3-point connections with the tractor running.
3
Position tractor and implement on a level surface.
Check air pressure in all tires.
4
The sprayer tank should be empty.
5
You may use the turnbuckle supplied with your tractor
instead of the top link bars
1
and
2
. If you choose to
use your turnbuckle, skip to step
7
.
6
As illustrated at
C
, create a top link bar by connecting
components
1
and
2
: with the 3/4” bolt holes oriented
to the outside, align the bars to form your desired
overall length, see
E
. You must use two 5/8” fasteners
5
to keep the top link bar rigid: space the fasteners as
far apart as your desired spacing will allow.
7
As illustrated at
A
, pin your keyhole pads
4
and the top
link bar/turnbuckle to the upper 3-point mount bracket
on the tractor. Install pads and top link as illustrated.
8
As illustrated at
B
, install your sag chains
3
on the
sprayer lower lift pins, orient as shown. Allow the
chains to hang out of the way. Install the tractor lift
arms to the outside of the sag chains; install snap pins.
9
Start the tractor and raise the lift arms enough to in-
stall the top link bar or turnbuckle as illustrated at
D
.
10
As illustrated in
fig 2
, lift the sprayer up to operat-
ing height: the pump shaft and the tractor PTO shaft
are in-line. Note if the top link bar must be shorter or
longer to level the sprayer.
11
Set the sprayer down to make adjustments to the top
link or turnbuckle length. We recommend blocking up
the sprayer when you set it down: this will aid level-
ling the sprayer. Many operators will set-up a stack of
pallets for sprayer storage when not in use: this speeds
hook-up and disconnect of the sprayer.
Set the top link length for proper operating height:
level the sprayer and align the tractor PTO shaft and
the pump shaft,
fig. 3
.
12
Raise the tractor lift arms above operating height to
set the sag-chains
3
. Remove the snap pins from the
keyhole pads
4
and feed the chain through the back of
the keyhole pad opening.
The number of chain links between the keyhole pad
and the sprayer should be the same on both the left
and right sag chain. Seat the chain in the keyhole slot
and re-install the snap pins.
Lower the tractor lift arms: the sprayer should be sup-
ported by the sag chains at operating height.
13
Check that all fasteners are tight.
A
B
D
C
5
2
4
3
3
1
top link bar
rollbar clearance top link bar
standard length 16”
call for other options
call for options
E
fig.1
fig.2
fig.3
CHEMICAL CONTAINERS INC.
800 346 7867
Содержание Pakblast 50 Gal
Страница 2: ......
Страница 19: ...xvii Read this manual completely before operating follow all safety instructions ...
Страница 28: ...Pak Blast 50 gallon 10 CHEMICAL CONTAINERS INC 800 346 7867 ...
Страница 42: ...10 1 11 12 13 8 12 13 5 4 6 7 14 9 2 3 right left ...
Страница 49: ...31 Pak Blast 50 gallon Read this manual completely before operating follow all safety instructions ...
Страница 56: ...Pak Blast 50 gallon 38 CHEMICAL CONTAINERS INC 800 346 7867 ...