n19
n20
n21
Use the 3mm Allen Key
to tighten the M5x8 and
M5x12 BHCS that hold the
support to the bridge rail.
Do not overtighten or you
may split the plastic.
Slide the support nearest
to the X/Y Upright so that
it is 10 links apart from
the middle support, and
fasten this with a M3x25
BHCS.
Again, tighten the M5x8
and M5x12 for this support
as well.
gigabot
®
: unassembled
239
Содержание Gigabot
Страница 1: ...Bed Frame Bed Plate Installation...
Страница 26: ...F D Y Motor Z Limit Switch Installation...
Страница 36: ...Wiring Y Supports Electrical Box...
Страница 51: ...Wiring Preliminary Routing...
Страница 64: ...Wiring Connect Components Cover Panduits...
Страница 74: ...Wiring Trolley Wiring...
Страница 89: ...WIRING CABLE CARRIERS PANDUIT COVERS...