J4
J5
J6
Install 3 total Y axis cable
carrier supports into the
left runway rail. These
will be put in their final
spacing once the Y axis
cable carrier is installed.
Next you will be
assembling the electrical
box uprights with the
electrical box.
Prepare 4 triangle braces
with an M5x10 BHCS and
a T-nut on one side, as
shown. If there is more
than one hole on one side
of the brace, use the hole
that is most centered.
gigabot
®
: unassembled
181
Содержание Gigabot
Страница 1: ...Bed Frame Bed Plate Installation...
Страница 26: ...F D Y Motor Z Limit Switch Installation...
Страница 36: ...Wiring Y Supports Electrical Box...
Страница 51: ...Wiring Preliminary Routing...
Страница 64: ...Wiring Connect Components Cover Panduits...
Страница 74: ...Wiring Trolley Wiring...
Страница 89: ...WIRING CABLE CARRIERS PANDUIT COVERS...