K10
K11
K12
Route the ZL motor cable
towards the Z motor.
Route the YL motor cable
up towards the Y motor.
You can insert it into one
of the Panduit slots to hold
it temporarily for now.
Route the E2 motor cable
up through the initial Y
axis cable carrier on the
corner plate and along
the left runway rail in the
same way as the X motor
cable.
gigabot
®
: unassembled
198
Содержание Gigabot
Страница 1: ...Bed Frame Bed Plate Installation...
Страница 26: ...F D Y Motor Z Limit Switch Installation...
Страница 36: ...Wiring Y Supports Electrical Box...
Страница 51: ...Wiring Preliminary Routing...
Страница 64: ...Wiring Connect Components Cover Panduits...
Страница 74: ...Wiring Trolley Wiring...
Страница 89: ...WIRING CABLE CARRIERS PANDUIT COVERS...