J1
J2
J3
Next you will install the Y
axis cable carrier supports
on the left runway rail of
the Gigabot. These are
the 3D printed pieces as
shown here.
Lay the flat leg of the
support on the rail as
shown.
Press the rounded end
into the slot of the rail
and tilt the support up.
It should stand upright
while maintaining a grip
on the rail itself.
gigabot
®
: unassembled
180
Содержание Gigabot
Страница 1: ...Bed Frame Bed Plate Installation...
Страница 26: ...F D Y Motor Z Limit Switch Installation...
Страница 36: ...Wiring Y Supports Electrical Box...
Страница 51: ...Wiring Preliminary Routing...
Страница 64: ...Wiring Connect Components Cover Panduits...
Страница 74: ...Wiring Trolley Wiring...
Страница 89: ...WIRING CABLE CARRIERS PANDUIT COVERS...