K22
K23
K24
Next, insert both
thermocouple wires (TC1 &
TC2) along with the head
cable (all trolley fans and
HE1 & HE2) into slot 4 of the
#4 Panduit and again run it
up through the initial Y axis
cable carrier on the corner
plate and along the left
runway rail, using the wiring
clips.
Generally, you will want to let
the wires run with the motor
cables on the bottom and the
limit switch wires, head cable,
and thermocouples stacked
on top of them as shown. The
specific arrangement aside
from this does not really matter
as long as the cables are not
twisted or tangled amongst
each other.
You can also continue
reusing the twist ties to
hold more and more wires
within the Panduits.
gigabot
®
: unassembled
202
Содержание Gigabot
Страница 1: ...Bed Frame Bed Plate Installation...
Страница 26: ...F D Y Motor Z Limit Switch Installation...
Страница 36: ...Wiring Y Supports Electrical Box...
Страница 51: ...Wiring Preliminary Routing...
Страница 64: ...Wiring Connect Components Cover Panduits...
Страница 74: ...Wiring Trolley Wiring...
Страница 89: ...WIRING CABLE CARRIERS PANDUIT COVERS...