n4
n5
n6
Divide the remaining X
cable carrier bundle into
increments of approximately
6 to 8 links. Do not divide
up the Y cable carriers yet,
or you risk accidentally
mixing them together and
accidentally changing the
number of total links in either
the X or Y cable carriers.
On one section of cable
carrier links, open all of
the doors as shown. Use a
small flathead screwdriver
if needed.
Insert the trolley wires into
this section of links as shown,
starting with the E1 and E2
cables on top, then the head
cable and thermocouple wires
below that. Exact arrangement
apart from this does not matter,
as long as the wires do not
get tangled or overlap each
other—keep them as parallel
as possible while installing
cable carriers.
gigabot
®
: unassembled
234
Содержание Gigabot
Страница 1: ...Bed Frame Bed Plate Installation...
Страница 26: ...F D Y Motor Z Limit Switch Installation...
Страница 36: ...Wiring Y Supports Electrical Box...
Страница 51: ...Wiring Preliminary Routing...
Страница 64: ...Wiring Connect Components Cover Panduits...
Страница 74: ...Wiring Trolley Wiring...
Страница 89: ...WIRING CABLE CARRIERS PANDUIT COVERS...