background image

49

Cast Iron Condensing Boilers – Installation Manual

FlexCore Stainless Steel Condensing Boilers – Installation Manual

In the Commonwealth of Massachusetts, the 

installation must be performed by a licensed 

plumber or gas fitter. 

(b) Exemptions

The following equipment is exempt from 248 CMR 5.08(2)(a) 

1 through 4:
1.  The equipment listed in Chapter 10 entitled “Equipment Not 

Required To Be Vented” in the most current edition of NFPA 

54 as adopted by the Board; and

2.  Product Approved side wall horizontally vented gas fueled 

equipment installed in a room or structure separate from 

the dwelling, building or structure used in whole or in part 

for residential purposes.

(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT 

VENTING SYSTEM PROVIDED.

When the manufacturer of Product Approved side wall horizon-

tally vented gas equipment provides a venting system design 

or venting system components with the equipment, the instruc-

tions provided by the manufacturer for installation of the equip-

ment and the venting system shall include:
1.   Detailed instructions for the installation of the venting system 

design or the venting system components; and

2.   A complete parts list for the venting system design or venting 

system. 

(d) MANUFACTURER REQUIREMENTS – GAS EQUIPMENT  

VENTING SYSTEM NOT PROVIDED.

When the manufacturer of a Product Approved side wall hori-

zontally vented gas fueled equipment does not provide the 

parts for venting the flue gases, but identifies “special venting 

systems”, the following requirements shall be satisfied by the 

manufacturer:
1.  The referenced “special venting system” instructions shall 

be included with the appliance or equipment installation 

instructions; and 

2.   The “special venting systems” shall be Product Approved by 

the Board, and the instructions for that system shall include 

a parts list and detailed installation instructions.

 

(e) A copy of all installation instructions for all Product 

Approved side wall horizontally vented gas fueled equip-

ment, all venting instructions, all parts lists for venting 

instructions, and/or all venting design instructions shall 

remain with the appliance or equipment at the completion 

of the installation.

  Improper venting can result in excessive levels 

of carbon monoxide which can cause severe 

personal injury or death!

(a) For all side wall horizontally vented gas fueled 

equipment installed in every dwelling, building or structure 

used in whole or in part for residential purposes, including 

those owned or operated by the commonwealth and where 

the side wall exhaust vent termination is less than seven (7) 

feet above finished grade, in the area of the venting,  

including but not limited to decks and porches, the 

following requirements shall be satisfied:

1.   INSTALLATION OF CARBON MONOXIDE DETECTORS. 

At the time of installation of the side wall horizontal vented 

gas fueled equipment, the installing plumber or gasfitter 

shall observe that a hard wired carbon monoxide detector 

with an alarm and battery back-up is installed on the floor 

level where the gas equipment is to be installed. In addition, 

the installing plumber or gasfitter shall observe that a battery 

operated or hard wired carbon monoxide detector with an 

alarm is installed on each additional level of the dwelling, 

building or structure served by the side wall horizontal 

vented gas fueled equipment. It shall be the responsibility of 

the property owner to secure the services of qualified 

licensed professionals for the installation of hard wired 

carbon monoxide detectors.
a.  In the event that the side wall horizontally vented gas 

fueled equipment is installed in a crawl space or an attic, 

the hard wired carbon monoxide detector with alarm and 

battery back-up may be installed on the next adjacent 

floor level.

b.   In the event that the requirements of this subdivision can 

not be met at the time of completion of installation, the 

owner shall have a period of thirty (30) days to comply 

with the above requirements; provided, however, that 

during said thirty (30) day period, a battery operated 

carbon monoxide detector with an alarm shall be 

installed.

2.   APPROVED CARBON MONOXIDE DETECTORS. Each 

carbon monoxide detector as required in accordance with 

the above provisions shall comply with NFPA 720 and be 

ANSI/UL 2034 listed and IAS certified. 

3.   SIGNAGE. A metal or plastic identification plate shall be 

permanently mounted to the exterior of the building at a 

minimum height of eight (8) feet above grade directly in line 

with the exhaust vent terminal for the horizontally vented 

gas fueled heating appliance or equipment. The sign shall 

read, in print size no less than one-half (1/2) inch in size, 

“GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL 

OBSTRUCTIONS”.

4.   INSPECTION. The state or local gas inspector of the side 

wall horizontally vented gas fueled equipment shall not 

approve the installation unless, upon inspection, the 

inspector observes carbon monoxide detectors and signage 

installed in accordance with the provisions of 248 CMR 

5.08(2)(a)1 through 4. 

  Improper venting can result in excessive levels 

of carbon monoxide which can cause severe 

personal injury or death!

   

MACODE-3

NOTICE!

Commonwealth of Massachusetts  

Installation Requirements

Содержание FLEXCORE CK7000

Страница 1: ...ge The boiler can only be operated with a dust freeairsupply Followtheinstructionmanualprocedurestoductairtotheboilerairintake Iftheboilerhasbeencontaminatedbyoperation with contaminated air follow th...

Страница 2: ...OF 160 PSI 1103 kPa WATER INSTALLER THESE INSTRUCTIONS TO BE AFFIXED ADJACENT TO THE BOILER WATER HEATER CONSUMER RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE PURPOSES CONTENTS Before Your Start pa...

Страница 3: ...flooring but never on carpeting 4 Locate the boiler in an area that will prevent water damage to adjacent construction should a leak occur or during routine maintenance 5 DO NOT place this boiler hea...

Страница 4: ...be within 12 in 300 mm of but not less than 3 in 80 mm from the bottom of the enclosure Where directly communicating with the outdoors or communicating with the outdoors through vertical ducts each o...

Страница 5: ...propriate thimbles and fire stops must be used where required Improper installation of common positive pressure vent systems can result in excessive levels of carbon monoxide which can cause severe pe...

Страница 6: ...ry IV 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Standard Tee 1 25 20 ft 25 ft 25 ft 30 ft 35 ft 35 ft 40 ft 40 ft 40 ft 50 ft 50 ft 55 ft 55 ft 55 ft Boot Tee 0 65 10 ft 15 ft 15 ft 15 f...

Страница 7: ...all metal vent system passes through an unheated space it must be insulated with insulation rated for 400 F 204 C Structural penetrations must be made using approved fire stops The top of a vertical v...

Страница 8: ...UARD Security Chimneys Secure Seal Schebler Chimney Systems e Vent VAN PACKER CS Z Flex Z Vent Jeremias GOV ICC VIC Exhaust Termination Hood Exhaust 90 deg Exhaust Tee Exhaust 45 deg Exhaust Straight...

Страница 9: ...L6 S2D 09 00002 002 09 0112 2000 2500 9801MAD SS8FFNSAU SSD8FFNSAUK SWKL8 S2D 09 00002 001 09 0113 3000 3500 91001MAD SS10FFNSAU SSD10FFNSAUK SWKL10 S2D 09 0310 004 09 0115 4000 4500 5000 91201MAD SS1...

Страница 10: ...ric dampers may be omitted When required by applicable codes install a thermal spill switch on each barometric damper 1 Connect each boiler riser to the common vent with a Y connection or Boot T only...

Страница 11: ...er to prevent pressure differences due to prevailing winds In cold climates double wall or insulated inlet pipe recommended to prevent condensation 0 1 2 3 4 5 6 7 8 9 0 5 10 15 20 Horizontal Distance...

Страница 12: ...nsing Boilers Installation Manual Figure 4 Vertical Air Intake and Venting for Direct Vent System Figure 5 Combination Direct Vent Systems 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1 2 FT 1 7 m...

Страница 13: ...ction must also be followed Figure 6 Side Wall Venting VERTICAL VENT Recommended POSITIVE PRESSURE CATEGORY IV In this configuration the boiler blower is used to push the flue products vertically to t...

Страница 14: ...e 8 The chimney system must provide a negative pressure of 0 02 to 0 10 in 0 51 to 2 5 mm WC at the boiler flue collar with the unit running When using a listed metal chimney system the chimney system...

Страница 15: ...s les portes entre l espace o les appareils toujours raccord s du syst me d vacuation sont install s et les autres espaces du b timent Mettre en marche les s cheuses tous les appareils non raccord s a...

Страница 16: ...of 2 ft 61 cm from the center line of the terminal E Clearance to unventilated soffit F Clearance to outside corner G Clearance to inside corner H Clearance to each side of center line extended above...

Страница 17: ...00 Btuh 3 kW and 100 000 Btuh 30 kW 36 in 91 cm for appliances 100 000 Btuh 30 kW 4 ft 1 2 m below or to side of opening 1 ft 300 mm above opening C Clearance to permanently closed window D Vertical c...

Страница 18: ...ch deck or balcony is fully open on a minimum of two sides beneath the floor NOTES 1 In accordance with the current CSA B149 1 Natural Gas and Propane Installation Code 2 In accordance with the curren...

Страница 19: ...PE DISCHARGE PER ASME SECTION IV SO AS TO AVOID EXPOSURE OF PERSONS TO HOT LIQUID OR VAPOR AND ALLOW COMPLETE DRAINAGE OF RELIEF VALVE AND PIPING LOW WATER CUTOFF CONDENSATE DRAIN ASSEMBLY AIR VENT AI...

Страница 20: ...670 9 89 4 8000 154 3 771 5 102 9 9000 174 3 871 5 116 2 Min Max flow correspond to a 20 F 100 F t at full input for applications requiring operation above and or below these parameters please consult...

Страница 21: ...ppm chloride concentration and no greater than 300 ppm hardness Suspended solids such as Magnetite Iron Oxides must be flushed from the system prior to commissioning the boiler s The PH level must be...

Страница 22: ...WATER MAKE UP Water Meter WM WM For Heat net Operation A Sensor Is Required And Installed At A Minimum Of 12 From Primary Loop Tee Riom 0205_a Tangential Type Air Separator Aquastat Heat Net Sensor Pr...

Страница 23: ...water born bacteria Figure 14 Typical Single Boiler with Indirect Storage Tank Piping RIOM 0206_A HEAT NET SENSOR EXPANSION TANK THERMOMETER BACKFLOW PREVENTION DEVICE GATE VALVE PUMP TEMPERATURE PRES...

Страница 24: ...M 0207_A HEAT NET SENSOR EXPANSION TANK THERMOMETER ATURE URE VALVE PRESURE RELIEF VALVE VACUUM RELIEF VALVE NOTES 1 WHEN USING INTERMITTENT PUMP AND PUMP DELAY LOCATE HEAT NET SENSOR WITH WELL IN LOW...

Страница 25: ...roperly If more than one appliance is supplied by the same supply pipe the piping must be sized based on the maximum possible demand Do not neglect the pressure drop due to pipe fittings Table 8 shoul...

Страница 26: ...to full load of the gas supply line and all the appliances running Always use a wrench on the gas valve body when making gas connections to it Never over tighten the piping entering the gas valve body...

Страница 27: ...EGULATOR PILOT SHUT OFF VALVE TYP REAR MODULE FRONT MODULE GAS MANIFOLD MAIN GAS VALVE RIOM 0210_C MODULATING GAS VALVE TYP SUPPLIED BY OTHERS PIPING GAS SUPPLY CK7000 TO 9000 REAR MODULE FRONT MODULE...

Страница 28: ...g Close the make up water valve and check and clean the strainers and make up water pressure reducing valve Open the make up water valve and adjust the system pressure if necessary The system should b...

Страница 29: ...ay will say Standby Figure 18 13 Slide the HeatNet controls low fire switch on the HeatNet control board to the low fire position 14 The boiler will begin the start sequence 15 When the main display r...

Страница 30: ...es and observe the combustion reading The Calibration Min Max represents the mapped signal sent to the blower and doesn t reflect the modulation as indicated on the Master Member Screens a Place the S...

Страница 31: ...that it can be changed Adjust the maximum value using the arrow keys to achieve the required combustion CO2 O2 Table 11 and pressure delta p Table 12 c The high fire trim adjustment is located on the...

Страница 32: ...0 45 0 45 0 45 0 45 0 40 0 45 0 45 0 45 0 45 Firing Rate 4500 Delta P W C 5000 Delta P W C 6000 Delta P W C 7000 Delta P W C 8000 Delta P W C 9000 Delta P W C Front Module Rear Module Front Module Re...

Страница 33: ...st limit in the Limit String to Ignition Control Have We received the BLOWER signal CALL FOR HEAT PRE_PURGE Interlocks OK Are we below the Temp Band YES fire the boiler NO Send 120 VAC BLOWER signal L...

Страница 34: ...h a dc voltmeter Figure 20 Pilot Assembly CHECKING ADJUSTMENT OPERATION Spark Gap The gap has to be measured and adjusted with the igniter removed from the boiler Observe the trial for ignition to con...

Страница 35: ...Water Cutoff Ensure that the low water cutoff device s function properly Test in accordance with the manufacturer s instructions included with the device s DIAGNOSTICS The FlexCore has a display that...

Страница 36: ...this manual for reference 1 Check the operating controls for proper operation 2 The probe on a probe low water cut off must be removed cleaned and inspected at least once a year Ensure that the low wa...

Страница 37: ...UBING POSITIVE PRESSURE TAP NEGATIVE PRESSURE TAP PILOT VALVE ASSEMBLY ASCO AIR SHUT OFF VALVE UV SCANNER AIR PUMP AIR BOX DIFFERENTIAL PRESSURE PILOT GAS PILOT AIR NOTES 1 TYPICAL PER EACH INDIVIDUAL...

Страница 38: ...OVE 1 2 3 4 5 6 7 8 Low Fire Hold Fires the boiler at the minimum rate while in Calibrate This functions exactly as the T1 input Calibrate Allows adjustment of the Minimum Fire Maximum Fire and Pilot...

Страница 39: ...E VIEW C SEE VIEW D RIOM 0217_D 46 SEE VIEW F 49 17 22 19 49G 49H 1 1A 2 2A 3 3A 5 5 9 8 10 11 7 6 1 4 23A SEE VIEW A 49F SEE VIEW E 48 47 45 15 16 18 44A 50 51 41A 42A 24 21 25B 33 25A 24A 21 20 43A...

Страница 40: ...VIEW D RIOM 0217_D SEE VIEW F 22A 23A 48 47 46 45 15 16 19A 18 17A 44A SEE VIEW A 25A 25C 25D 21 22A 21 22B 23D 24A 24B 23C 17C 19A 17D 19B 41B 42B 43B 49D 49C 49A 33 49H 49G 49E 44C 44D 44F 2B 5 1B...

Страница 41: ...66A 67A 68A 69 65A 68B CK0850 TO 1000 ONLY 58C 58A 58B 59 58 53 52 54 56 61 54 63 54 65 60A 60C 60B 60 VIEW A RIOM 0217_D 64 60D 62 57 55 67 68 69 66 VIEW B 73 73 45 72 RIOM 0217_D 72 72 45 72 45A 45...

Страница 42: ...42 FlexCore Stainless Steel Condensing Boilers Installation Manual 80 82A 82A 81 80A 79A 78 77A RIOM 0217_D VIEW C 76A 77A 79A 80A 81 78 82A 82 81 79 77 78 76 VIEW D RIOM 0217_D 84 83 86 85...

Страница 43: ...ainless Steel Condensing Boilers Installation Manual VIEW E RIOM 0217_D OR 92A 97A 95A 96 93 98 94A 87 88 95 98 97 93 92A 96 94 87 88 90 89 OR 93 94 96 97 98 91 95 92 96A 88 87 VIEW F RIOM 0217_D 71 1...

Страница 44: ...74 0015 005 1 1 1 33 Air Box Splice Panel 74 0022 001 1 1 1 1 1 2 2 2 41 Rear Jacket Panel 75 0049 001 1 1 1 1 1 1 41A 75 0049 002 1 1 1 1 1 41B 75 0049 003 1 1 1 NS DrainValve 11 0461 1 1 1 1 1 1 2...

Страница 45: ...mall Combustion Chamber 01 0061 002 1 1 1 1 1 SS Ring Large Combustion Chamber 01 0062 002 1 1 1 1 2 1 2 2 3 3 3 56 Combustion Chamber Small 05 0401 001 1 1 1 1 1 Combustion Chamber Large 05 0401 002...

Страница 46: ...lve 11 0376 002 1 1 1 1 1 1 2 2 2 2 2 3 3 3 86 Mini Fan 12 0021 002 1 1 1 1 1 1 2 2 2 2 2 3 3 3 87 Air Pressure Switch 0 25 WC 14 0067 1 1 1 1 1 1 2 2 2 2 2 3 3 3 88 Air Pressure Switch 2 5 WC 14 0068...

Страница 47: ...10 2 Disable any external call for heat and toggle the remote local switch to REMOTE follow section Operating Instructions Steps 11 14 3 Ignition and pilot adjustment Toggle the LOW FIRE switch to cy...

Страница 48: ...LOW WATER CUT OFF HIGH LIMITS COMMISSIONING THE BOILER UNIT CYCLED MINIMUM OF 15 TIMES THE DELTA T BETWEEN THE HEATER IN LET AND OUTLET IS CRITICAL TO PROP ER FLOW BEFORE YOU LEAVE THE JOB SITE YOU MU...

Страница 49: ...ll exhaust vent termination is less than seven 7 feet above finished grade in the area of the venting including but not limited to decks and porches the following requirements shall be satisfied 1 INS...

Страница 50: ...ioning the boiler s In addition pH levels must be in the 6 5 10 range Failure to follow these guidelines will void the warranty This Limited Warranty does not Apply a If the product has been subjected...

Страница 51: ...51 FlexCore Stainless Steel Condensing Boilers Installation Manual...

Страница 52: ...www rbiwaterheaters com 7555 Tranmere Drive Mississauga Ontario L5S 1L4 Canada Phone 905 670 5888...

Отзывы: