3
CONTENTS
WARNINGS
Pay Attention to These Terms
4
For your safety read before operating
5
COMPONENT LOCATION
General layout
6
Control board
7
GETTING STARTED
Before switching ON
8
Boiler controls
8
Lighting the boiler
8
Adjusting the operating temperature
8
Adjusting the hot water temperature
8
How to top-up the system pressure
9
How to reset the boiler
9
BOILER FAULT CODES
How to shut down the system for short periods
9
How to shut down the system for long periods
9
How to care for the boiler
9
WHAT IF...
What if I suspect a gas leak
10
What if I have frequently have to top-up the system
10
What if the red light is ON
10
What if the boiler is due its annual service
10
What if I need to call a service technician
10
MAINTENANCE
Suggested Minimum Maintenance Schedule
10
Preventive Maintenance Schedule
11
Содержание XPAK 85
Страница 1: ......
Страница 2: ......
Страница 12: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468...