background image

INSTALLATION INSTRUCTIONS

5973129-5

FIG. 5

FIG. 6

Many of the problems related to electric operators are due to improper installation. The following
installation procedures are recommended to minimize these problems.

Begin installation with door in closed position.

The operator is generally mounted over the center of the 
door, but occasionally, off-center mounting may be required. 
If required, the operator may be mounted up to 24 inches 
off center, for torsion spring doors only. Extension springs
will always require center mounting.

Locate high rise point of door, Fig. 4, and use level to

mark high point on header as shown.

Remove front mounting bracket (See Fig. 1) from rail
assembly and install on front wall above spring

assembly, Fig. 5. Bottom edge of bracket should be
2 inches above high rise point marked on header.
Secure bracket to wall using either lag screws or self
tapping screws furnished in hardware package.

Resting powerhead of operator on floor, attach front end
of rails to front mounting bracket. Swing unit into position
over door and temporarily hang powerhead end with
strong rope or place on tall ladder. Rear of operator
should be as low as possible and still allow door to clear
rail assembly.

Note:

If rear of operator is mounted too

high, permanent damage to door could result.

With operator in desired position, cut steel angle iron
hangers and secure operator at rear. (Hangers not
supplied)

Caution: Raynor recommends an intermediate

hanger on all installations over 10 feet high.

With hangers in place, tighten all bracket bolts. Remove
temporary hanger or ladder.

Warning:
Be certain mounting bracket is level

               and mounting pad is secure

FRONT MOUNTING

BRACKET

HIGH RISE POINT

OF DOOR

2"

LEVEL

HIGH RISE POINT

OF DOOR

MARK ON

HEADER

FIG. 4

FRONT MOUNTING BRACKET

INTERMEDIATE HANGER (WHEN REQUIRED)

DOOR 4'-6"

3" MAX.

INSTALL FRONT MOUNTING BRACKET

HANGING OPERATOR  Fig. 6

Содержание ControlHoist 2.0 STANDARD

Страница 1: ...ist 2 0 PLEASE READ THESE INSTRUCTIONS BEFORE STARTING INSTALLATION IT IS IMPORTANT THAT THIS OPERATOR BE INSTALLED CORRECTLY IN ORDER TO ACHIEVE SAFE AND PROPER OPERATION THIS OPERATOR HAS BEEN SUPPL...

Страница 2: ...replace the defective door components Labor charges for installations or repairs shall be the responsibility of the consumer and must be performed by an authorized Raynor Dealer This warranty extends...

Страница 3: ...s 9 Do not place hands in area of pulleys V belt sprockets chain or rotating shafts 10 Install warning placard on wall next to push button 11 Attach instruction booklet to wall near push button 12 Do...

Страница 4: ...ify delivering VISUAL INSPECTION carrier immediately rail assembly with lug B facing the open end of the rails ing packing material Unpack powerhead and trolley rail assemblies being 5973129 4 electri...

Страница 5: ...ng either lag screws or self tapping screws furnished in hardware package Resting powerhead of operator on floor attach front end of rails to front mounting bracket Swing unit into position over door...

Страница 6: ...e and operator voltage shown on the cover are the same 5973129 6 TO PRE VEN T ENT RAP MEN T Do not sta rt doo r dow nwa rd unle ss doo rwa y is clea r WAR NIN G W AR NING ATTACH DOOR BRACKET Some inst...

Страница 7: ...14 14 12 14 10 14 8 14 6 12 0 5 115 230 14 14 12 14 10 14 8 14 6 12 0 75 115 230 12 14 10 14 8 14 6 12 4 10 1 115 230 12 14 10 14 8 14 6 12 4 10 1 5 230 14 14 12 10 8 MINIMUM WIRE SIZE FOR SINGLE PHA...

Страница 8: ...minal Block 1 Terminal Block 2 High Voltage Wire Harness Connection LIGHT CCM NO1 SER C1NC1 NO2 C2NC2 ON OFF OPEN CLOSE ON OFF 24VDC 24VDC 24VAC 24VAC Terminal Block 3 24V DC Power Connection Auxiliar...

Страница 9: ...sing RD or RC wiring photo eye s or edge must be selected even though they are not required Note The photo eye or an electric edge must be monitored 5 SENSOR 2 TYPE will display there are three option...

Страница 10: ...OFF If a warning light is required select ON Press the stop button to continue 16 If a warning light is ON WARNING TIME will display The time is set in 1 second intervals from 3 seconds to 10 seconds...

Страница 11: ...r death 8 SAVE THESE INSTRUCTIONS OPERATING INSTRUCTIONS Operating the 3 Button Control Station 1 Press OPEN button The door should move in the open direction 2 Press STOP button The door should stop...

Страница 12: ...eck manual operation of door Refer to installation instructions 800 page 5972558 1 for guidelines Test all reversing devices once a month for proper operation Test all accessories that may have been s...

Страница 13: ...ng Off Stop button pressed or NOT connected On Open button sending signal pressed Off Open button is not sending signal 2 Open D12 6 I Lock D24 7 I Lock D23 On Chain hoist interlock circuit is open ch...

Страница 14: ...en limit switch and the open button is pushed This message will display anytime the board is not receiving a signal from the sensor 2 when close button is pressed Whether it is not connected activated...

Страница 15: ...minate stress on rollers and cables 1 Sunlight is blocking the receiving photo eye 2 Faulty photo eyes 1 Connect Operator to power source 2 Check voltage at L1 L2 for single phase and at L1 L2 L3 for...

Страница 16: ...oard Verify power consumption of the device s before installing You may have to power the device from an external power source using only the contacts of the device to activate the operator 3 The comm...

Страница 17: ...use the dry contacts of that relay to activate the device If more than 3 amps of power is being consumed through the auxiliary board then damage to the board may occur 2 There is a 14 pin connector o...

Страница 18: ...lied With Raynor Door NOTE Placement of Labels may vary from what is shown Spring Warning Tag Push Button Placard Locate Near Push Button Door Safety Label Bottom Fixture Danger Label Bottom Fixture D...

Отзывы: