Set time, date and day
Allows the user to set
the time, date and
day.
CT self-
check
Cut off all load then comfirm
This action must be
performed when the
inverter is externally
connected to the CT.
Before the CT self-
check, the inverter
needs to be
connected to the
power grid and the
battery. The backup
circuit breaker and
normal load breaker
needs to be
disconnected. The
CT self-check takes
about 1~5 minutes.
CT self-check steps:
Step 1: Open the external CT wiring port, the arrow points to the direction of the power
grid, put the wire into the external CT card slot, and buckle the buckle.
Step 2: Disconnect the backup loads and the normal loads.
Step 3: Connect the battery pack and Grid.
Step 4: Perform CT self-check via LCD.
Содержание RI-ENERGYFLOW-3P-MODULAR...
Страница 4: ...4...
Страница 12: ...12 Accessory Cable PACK10 2 Accessory Cable PACK20 4 Accessory Cable PACK30 6...
Страница 13: ...13 Accessory Cable PACK40 8...
Страница 14: ...14...
Страница 28: ...28 Figure 17 Wiring the Communication Cable...
Страница 30: ...30 Figure 19 PV Wiring Step12 Close the lid and tighten the screw Figure 20...
Страница 58: ...58...