Installation: Decal Placement
55
INSTALLATION
7. Install the supplied 30 Amp bolt down fuses to connect the previously connected chassis power cables to
positive side of the high current power strip.
8. Connect the connectors on the CAN injection pump harness to the corresponding open connectors on the
injection pump.
9. Route the remaining open connections for logic power and CAN along the existing machine cabling to the
logic power and CAN connections on the machine’s spray boom center section.
10. Secure the harness away from moving parts or crops with the provided cable ties. Secure the harness at least
every 12”.
DECAL PLACEMENT
FIGURE 82. Pump Station Decals
FIGURE 83. Fill Station Valve Operation Decal
Pump Valve
Operation Decal
Rinse Valve Operation Decal
(located on inside and outside
Installed Fill Station
Decal
Содержание Sidekick Pro
Страница 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 89: ...CHAPTER 9 System Diagrams Electrical 87 CHAPTER9SYSTEM DIAGRAMS ELECTRICAL Drawings start on next page ...
Страница 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Страница 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Страница 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...