![Raven Sidekick Pro Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/raven/sidekick-pro/sidekick-pro_installation-and-operation-manual_788997017.webp)
Installation: Installation Preparation
15
INSTALLATION
FIGURE 9. Stock Carrier Hose Guide Hoops
2. Cut the hoops off as near to the parallel link arms as possible.
NOTE:
The hoops will be reused.
3. Weld the hoops to the top side of the parallel link arm in the position shown below.
NOTE:
Protect the hood and hose from cutting debris or weld spatter.
FIGURE 10. Hoop Installation
4. Reconnect the battery and field computer cables.
5. Fold the booms back to the transport position.
6. Locate the axle extension toggle switch in the cab.
NOTE:
Follow machine/manufacturer instructions to extend the axles.
Cut Hoops Off
Next to Parallel
Link Arm
Protect the Hood
from Cutting Debris
or Weld Spatter
30”
16”
Measure From Here
Содержание Sidekick Pro
Страница 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 89: ...CHAPTER 9 System Diagrams Electrical 87 CHAPTER9SYSTEM DIAGRAMS ELECTRICAL Drawings start on next page ...
Страница 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Страница 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Страница 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...