C
HAPTER
3
34
CAN Sidekick Pro Injection for Case IH 3/4XXX Installation and Operation Manual
FIGURE 44. Tank Drain Fitting Assembly
2. Connect the tank drain valve to the tank using the provided gaskets and clamps. Orient the drain valve so the
large end of the valve is in the position shown below.
FIGURE 45. Tank Drain Fitting Installed
DUAL PUMP STATION PLUMBING INSTALLATION
1. Assemble the dual pump fittings as shown in the image below. Seal all threaded joints with the provided pipe
thread sealant.
NOTE:
Attach valves to the strainer so the strainer cap can be removed.
1” NPT to 3/4” NPT
Reducer Bushing
3/4” NPT
Nipple
3/4” Drain
Valve
3/4” NPT
Plug
M100
Gasket
M100
Clamp
3/4” NPT to
M100
M100 to 1”
Hose Barb
Elbow
Install These Fittings into Tank Before Assembling Elbow
Apply Thread
Sealant (may
require thread
tape)
Elbow Pointed
Downward,
Towards the
Machine Front
Tank Drain Port
Содержание Sidekick Pro
Страница 12: ...CHAPTER 2 10 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 84: ...CHAPTER 7 82 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 88: ...CHAPTER 8 86 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...
Страница 89: ...CHAPTER 9 System Diagrams Electrical 87 CHAPTER9SYSTEM DIAGRAMS ELECTRICAL Drawings start on next page ...
Страница 91: ...System Diagrams Electrical 89 SYSTEM DIAGRAMS FIGURE 2 Single Pump System Diagram ...
Страница 93: ...System Diagrams Electrical 91 SYSTEM DIAGRAMS PLUMBING FIGURE 4 Dual Pump Injection Plumbing ...
Страница 96: ...Index 94 CAN Sidekick Pro Injection for Case IH 3 4XXX Installation and Operation Manual ...