![Raven Sidekick Pro Скачать руководство пользователя страница 17](http://html2.mh-extra.com/html/raven/sidekick-pro/sidekick-pro_installation-and-operation-manual_3847237017.webp)
CHAPTER
4
Installation: Overview
15
CHAPTER 4
INSTALLATION
OVERVIEW
The following steps must be completed to install the Raven Sidekick Pro™ ICD injection system:
1. Select and plumb the point of injection.
a. Install carrier and chemical injection check valves.
b. Install in-line mixer.
See the
Initial Plumbing and Point of Injection
2. Mount the Sidekick Pro™ ICD injection module or tank.
See the
3. Mount the Sidekick Pro™ ICD injection pump.
See the
Mount the Sidekick Pro™ ICD Pump and Chemical Tank
4. Plumb the Sidekick Pro™ ICD pump and injection lines into the main carrier line at point of injection.
See the
Sidekick Pro™ ICD Injection System Plumbing
5. Install the closed calibration system (if equipped).
See the
Plumb the Sidekick Pro™ ICD Closed Calibration System
6. Plumb the rinse system.
See the
7. Connect the Sidekick Pro™ ICD injection pump to the ISOBUS and a source of electrical power.
See the
The following sections provide detailed information and procedures to assist with completing the above steps.
Contact a local Raven dealer with questions or for further assistance during the installation procedure.
FIGURE 1. Example Sidekick Pro™ ICD Injection System