![Raven Sidekick Pro Скачать руководство пользователя страница 25](http://html2.mh-extra.com/html/raven/sidekick-pro/sidekick-pro_installation-and-operation-manual_3847237025.webp)
4
Installation: Mount the Sidekick Pro™ ICD Pump and Chemical Tank
23
INSTALLATION
MOUNT THE SIDEKICK PRO ICD PUMP
• Mount the Sidekick Pro™ ICD pump as close as possible to the selected point of injection.
• Mount the Sidekick Pro™ ICD pump so that the outlet port is pointing up. The pump will not meter product
application correctly if the pump is mounted in any other orientation.
• Mount the Sidekick Pro™ ICD in a location which provides access to the pump and ECU to simplify calibration
and troubleshooting.
FIGURE 8. Sidekick Pro™ ICD Pump Mounting and Bracket Orientation
NOTE:
The pump mounting bracket may be rotated to accommodate mounting to a vertical surface,
however, the injection pump must be mounted level with the outlet port perpendicular to the ground.
Pump Inlet
Port
Pump
Mounting
Bracket
Pump Outlet and
Recirculation Port