4
Installation: Mount the Sidekick Pro™ ICD Pump and Chemical Tank
21
INSTALLATION
MOUNT THE SIDEKICK PRO™ ICD PUMP AND CHEMICAL TANK
Installation and mounting of the Sidekick Pro™ ICD injection pump and injection module, or chemical tank, will
vary between implements. Use the following sections to help select an appropriate mounting location on the
implement.
MOUNT THE INJECTION MODULE
The Sidekick Pro™ ICD injection module provides a platform for mounting the chemical supply tank and Sidekick
Pro™ ICD injection pump in the optimal configuration for pump operation.
NOTE:
The Sidekick Pro ICD injection module may be ordered with a 24 gallon [90.85 L] chemical supply
tank, a 50 gallon [189.27 L] chemical supply tank, or without a chemical tank to connect the injection
system with an existing tank on the vehicle or purchased separately.
• Mount the injection module platform in an area close to the boom valve manifold. This minimizes the volume
of chemical in the injection line between the pump and point of injection and allows for more accurate control
of the injected chemical.
• Verify that the hand valves and drain are accessible in the selected mounting location.
• Verify that the injection pump is accessible to perform periodic maintenance.
FIGURE 6. 24 Gallon [90.85 L] Injection Module Platform Dimensions
TABLE 4.
24 Gallon [90.85 L ] Injection Module and Platform Dimensions
Module Dimensions
Mounting Port
Dimensions
Width (A)
Depth (B)
Height (E)
Width (C)
Depth (D)
27.7”
[70.36 cm]
17”
[43.2 cm]
42”
[106.75 cm]
17”
[43.2 cm]
9.2”
[23.27 cm]
A
D
C
B
E