Sidekick Pro™ ISO Installation & Operation Manual
6. Select the Tools icon and select the diagnostics icon to access the Product Diagnostics screen.
7. Select the Master Switch icon to toggle the master switch to the On position and select the ‘Start CAL’ button
from the soft keys area.
8. Verify that the hand valve is set to the recirculation mode and ensure that the closed calibration plunger is
pushed all the way down on the pump and select the ‘OK’ button.
9. The pump will proceed to run until the console detects that 1 oz. [0.3 dL] of chemical has been passed through
the pump. The console will display a “CAL complete” message.
NOTE:
To stop calibration while in progress, at any time pass a metal object past the calibration sensor.
If the console displays an error message during the calibration process, verify that the conditions
listed in step 4 are present. If the problem continues, see Chapter 6, Injection Diagnostics and
Troubleshooting, to resolve issues during the pump calibration process.
After the initial calibration has been completed, the injection pump calibration process may be
re-initiated by passing a metal object past the integrated calibration sensor twice. Use an object such
as a screw driver or spare bolt.
10. When the display shows the calibration complete message, touch the ‘Stop CAL’ button to stop the calibration
process.
11. Check the calibrator plunger on the injection pump. The black ring on the plunger should stop within the
“window” markings on the calibrator cover if the pump calibration is successful. If the black ring stops slightly
outside of the calibration window, the meter cal value may be adjusted to compensate:
•
If the plunger stops below the calibration window, increase the meter cal.
•
If the plunger stops above the calibration window, decrease the meter cal.
The initial meter cal should be adjusted in increments of 1% from the default meter cal. If the meter cal must be
increased or decreased by more than 5% from the value printed on the pump housing, perform pump
maintenance procedures outlined in Chapter 7, System Maintenance. If the problem persists, see Chapter 6,
Injection Diagnostics and Troubleshooting, for possible solutions to issues with the injection pump.
NOTE:
Before beginning an application, verify that the hand valve is set to the injection position and select
the OK button on the UT display to proceed. If the hand valve is not set properly, the pump will not
inject chemical into the main product line during an application.
Содержание Sidekick Pro ISO
Страница 1: ...Sidekick Pro ISO Installation Operation Manual P N 016 0171 509 Rev E 07 17 E29803 Copyright 2017 ...
Страница 8: ...CHAPTER 1 4 Sidekick Pro ISO Installation Operation Manual ...
Страница 16: ...CHAPTER 2 12 Sidekick Pro ISO Installation Operation Manual ...
Страница 46: ...CHAPTER 4 42 Sidekick Pro ISO Installation Operation Manual ...
Страница 70: ...CHAPTER 7 66 Sidekick Pro ISO Installation Operation Manual ...
Страница 80: ...Index 76 Sidekick Pro ISO Installation Operation Manual ...