41
APPENDIX 2
PROCEDURE TO TEST FLOW METER CABLES
Disconnect cable from Flow Sensor. Hold Flow Sensor cable so that the keyway is pointing in the
12 o’clock position:
PROCEDURE TO CHECK CABLE:
1)
Enter a METER CAL number of one (1) in key labelled
2)
Depress key labelled
3)
Place BOOM switches to ON.
4)
With small jumper wire (or paper clip), short between the 2 o’clock and 6 o’clock sockets with a
"short-no short" motion. Each time a contact is made, the TOTAL VOLUME should increase by
increments of 1 or more counts.
5)
If TOTAL VOLUME does not increase, remove the section of cable and repeat test at connector next
closest to Console. Replace defective cable as required.
6)
Perform above voltage checks.
7)
If all cables test good, replace Flow Sensor.
NOTE:
After testing is complete, re-enter correct METER CAL numbers before
application.
PIN DESIGNATIONS
2 o’clock socket location is ground.
10 o’clock socket location is power.
6 o’clock socket location is signal.
VOLTAGE READINGS
1) 2 o’clock socket to 6 o’clock socket = +5 VDC.
2) 2 o’clock socket to 10 o’clock socket = +5 VDC.
If a +5 VDC voltage reading is not present, disconnect the Speed
Sensor cable. If the Flow reading is restored, Test the Speed
Sensor cable per Appendix "PROCEDURE TO TEST SPEED
SENSOR EXTENSION CABLES".
Содержание SCS 661
Страница 1: ...SCS 661 FOR LIQUID AND GRANULAR APPLICATIONS INSTALLATION AND SERVICE MANUAL ...
Страница 2: ...W A R N I N G Disconnect console before jump starting charging battery or welding on equipment ...
Страница 3: ......
Страница 4: ... ...
Страница 6: ...Manual Rev D SCS 661 LIQ 07 02 016 0159 744 ...