
6
3.
MOUNTING THE CONTROL VALVE
1)
Mount the motorized Control Valve in the main hose line between the Flow Meter
and the booms, with motor in the upright position. (For flow less than 3 GPM
[11 lit/min] the motorized Control Valve is mounted in a by-pass line. Refer to
Appendix 3 for alternate plumbing diagram).
2)
Connect the Flow Control Cable connectors to boom valves, Flow Meter, and motorized
Control Valve. (Black wire to boom valve #1, Brown wire to boom valve #2, Blue
wire to boom valve #3, Blk/Wht wire to boom valve #4, Brn/Wht wire to boom valve
#5, Blu/Wht wire to boom valve #6 and Wht/Blk to boom valve #7).
Содержание SCS 460
Страница 1: ...SCS 460 Spra Coupe Spra Controller Operator s Manual P N 016 0159 865 Rev A 09 15 Copyright 2009 2015 ...
Страница 3: ......
Страница 45: ......
Страница 46: ......