![Rational iCombi Pro XS 6-2/3 Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/rational/icombi-pro-xs-6-2-3/icombi-pro-xs-6-2-3_operating-instructions-manual_3816265058.webp)
10 | iProductionManager
58 / 112
Operating instructions
3. Assign a name.
4. To confirm the action, press the button:
>>
The planning is displayed in the planning list.
10.7.2
Start planning
a
a
The iProductionManager is not currently processing any tickets. When tickets are processed, a message
appears, informing you that all tickets must be cancelled before planning starts.
1. Press the button
2. Press the desired planning.
>>
The planning starts immediately. The tickets are placed on the racks according to the planning. The tickets on
the ticket board are replaced by the tickets included in the planning.