background image

5

INSTALLER / OPERATOR

PLEASE READ AND FULLY 

UNDERSTAND. 

BY PROCEEDING YOU AGREE TO 

THE FOLLOWING.

 

I have visually inspected the site where the lift is to be 

installed and verified the concrete to be in good 
condition and free of cracks or other defects. I understand 
that installing a lift on cracked or defective concrete could 
cause lift failure resulting in personal injury or death.

 

I understand that a level floor is required for proper 

installation and level lifting. 

 

I understand that I am responsible if my floor is of 

questionable slope and that I will be responsible for all 
charges related to pouring a new level concrete slab if 
required and any charges.

 

 I understand that the lifts are supplied with 

concrete fasteners meeting the criteria of the American 
National Standard “Automotive Lifts - Safety Requirements 
for Construction, Testing, and Validation” ANSI/ALI 
ALCTV-1998, and that I will be responsible for all charges 
related to any special regional structural and/or seismic 
anchoring requirements specified by any other agencies 
and/or codes such as the Uniform Building Code (UBC) 
and/or International Building Code (IBC).

 

I will assume full responsibility for the concrete floor 

and condition thereof, now or later, where the above 
equipment model(s) are to be installed. Failure to follow 
danger, warning, and caution instructions may lead to 
serious personal injury or death to operator or bystander 
or damage to property. 

 

I understand that BendPak lifts are designed to be 

installed in indooor locations only. Failure to follow 
installation instructions may lead to serious personal injury 
or death to operator or bystander or damage

 

to property 

or lift.

Failure to follow danger, warning, and caution        

instructions may lead to serious personal injury or death 

to operator or bystander or damage to property. 

Please read entire manual prior to installation.

Do not operate this machine until you read and  

understand all the dangers, warnings and 

cautions in this manual. For additional copies

or further information, contact:

BendPak Inc. / Ranger Products

1645 Lemonwood Dr., 

Santa Paula, CA. 93060 

1-805-933-9970

www.bendpak.com

INSTALLER / OPERATOR

PROTECTIVE EQUIPMENT

Personal protective equipment helps makes installation 

and operation safer, however, does not take the place 

of safe operating practices. Always wear durable work 

  

clothing during any installation and/or service activity. 

Shop aprons or shop coats may also be worn, however 

loose  fitting clothing should be avoided. Tight fitting leath-

er gloves are  recommended to protect technician hands 

when handling parts. Sturdy leather work shoes with steel 

toes and oil resistant soles should be used by all service 

personnel to help prevent injury during typical installation 

and operation activities. Eye protection is essential during 

installation and operation activities. Safety glasses with 

side shields, goggles, or face shields are 

acceptable. Back belts provide support dur-

ing lifting activities and are also helpful in 

providing worker protection. Consideration 

should also be given to the use of hearing 

protection if  service activity is performed in an enclosed 

area, or if noise levels are high.

THIS SYMBOL POINTS OUT IMPORTANT SAFETY INSTRUCTIONS WHICH IF NOT FOLLOWED

COULD ENDANGER THE PERSONAL SAFETY AND/OR PROPERTY OR YOURSELF AND OTHERS

AND CAN CAUSE PERSONAL INJURY OR DEATH.  READ AND FOLLOW ALL INSTRUCTIONS IN

THIS MANUAL BEFORE ATTEMPTING TO OPERATE THIS MACHINE.

Содержание BendPak P-6

Страница 1: ...operate or repair this equip ment without reading this manual and the important safety instructions shown inside Keep this operation manual near the machine at all times Make sure that ALL USERS read...

Страница 2: ...replace at their option for the warranty period those parts returned to the factory freight prepaid which prove upon inspection to be defective BendPak Inc will pay labor costs for the first 12 months...

Страница 3: ...the lift for correct initial function Read and follow the safety instructions Keep them readily available for machine operators Make certain all operators are properly trained know how to safely and c...

Страница 4: ...ecifications 8 Packing List 8 Main Assembly View Description of Parts 9 Floorplan Specifications 10 Step 3 Locating Lift 11 Step 4 Power Unit Location 12 Step 5 Flow Divider Hydraulic Hose Installatio...

Страница 5: ...or or bystander or damage to property or lift Failure to follow danger warning and caution instructions may lead to serious personal injury or death to operator or bystander or damage to property Plea...

Страница 6: ...irs Secure plug so that it cannot be accidentally plugged in during service 14 WARNING RISK OF EXPLOSION This equipment has internal arcing or sparking parts which shouldnotbeexposedtoflammablevapors...

Страница 7: ...se this lift on any asphalt surface or any surface other than concrete DO NOT install or use this lift on expansion seams or on cracked or defective concrete DO NOT install or use this lift on a secon...

Страница 8: ...d Hose Assy 12 7mm x 3130mm DS P 6 P 6F 5570148 8 3 4 x 4 WEJIT Anchor bolts 5530455 PACKING LIST When removing the lift from shipping pallet angles pay close attention as the lift assemblies can slid...

Страница 9: ...9 P 6 P 6F Main Assembly Views...

Страница 10: ...Pad Length 53 1346 mm 53 1346 mm Over Width 18 457 mm 18 457 mm Overall Length 81 2057mm 78 2057mm Lowered Height 4 102mm 4 102mm Lifting Time 35 Seconds 35 Seconds Motor 110 220 VAC 60HZ 1Ph 110 220...

Страница 11: ...ng engineer before installing this lift to make sure the floor is capable of sustaining the load 4 After selecting a site place each unit in position making sure that the hydraulic cylinders are place...

Страница 12: ...aftey valve Z bracket on the upper left mounting hole of the power unit bracket STEP 5 Flow Divider Hydraulic Hose Installation 1 Secure the hydraulic flow divider to a permanent wall or fixture usual...

Страница 13: ...the data plate found on the motor for proper power supply and wire size NOTE The standard power unit can be run on either 110V or 220V It is already wired for 110V and equipped with a 3 wire power cor...

Страница 14: ...OURCE OR PANEL AND CANNOT BE RE ENERGIZED UNTIL ALL MAINTENENCE AND OR INSTALLATION PROCEDURES ARE COMPLETED WARNING DO NOT run power unit with no oil Damage to pump can occur The power unit must be k...

Страница 15: ...so will void the warranty Cut the provided 1 4 air line tubing with a sharp blade to lengths as required Tubing must be cut square with no burrs Note To assemble air line tubing into fitting use firm...

Страница 16: ...six times The cylinders are self bleeding After bleeding system fluid level in power unit reservoir may be down Add more fluid if necessary to raise lift to full height It is only necessary to add fl...

Страница 17: ...down a few times to insure that the locks are engaging uniformly and that the safety release mechanisms are functioning POST INSTALLATION CHECK OFF Main Lift Assemblies Properly Shimmed And Stable An...

Страница 18: ...ith the frame or other recommended lifting point To Raise Lift Raise the lift by pressing the push button on the power unit Raise lift until the vehicles tires clear the floor Stop and check to make s...

Страница 19: ...LOWERING handle until the lift starts to descend Stay clear of lift area Ensure that both safeties are not engaged Fully lower the lift and remove all lifting adapters before driving vehicle away WEE...

Страница 20: ...an The vehicle manufacturer s recommendations should be used for spotting and lifting the vehicle LIFT OPERATION SAFETY It is important that you know the load limit Be careful that you do not overload...

Страница 21: ...ing lift KEEP HANDS AND FEET CLEAR Remove hands and feet from any moving parts Keep feet clear of lift when lowering Avoid pinch points ONLY TRAINED OPERATORS should operate this lift All non trained...

Страница 22: ...22...

Страница 23: ...23...

Страница 24: ...start unit allowing possible contamination it to run for 15 seconds 4 Dirty oil Replace oil with clean Dexron ATF 5 Tighten all fasteners Tighten fasteners to recommended torques 6 Check for free mov...

Страница 25: ...new part Replace with new part 5 Reset circuit breaker fuse Reset circuit breaker fuse 6 Return unit for repair Return unit for repair 7 See Installation Manual See Installation Manual 8 Check wall ou...

Страница 26: ...e inlet hose assembly 3 Oil seal damaged or cocked Replace oil seal and install 4 Bleed cylinders See Installation Manual 5 See Installation Manual Consult Lift Manufacturer 6 Check vehicle weight Com...

Страница 27: ...lift all the way down 2 Oil seal damaged and cocked Replace oil seal around pump shaft 3 Bleed cylinder Refer to Installation Manual 4 Flush release valve Hold release handle down and start unit allow...

Страница 28: ...__________________________________________ ____________________________________________________________________ ____________________________________________________________________ ___________________...

Страница 29: ...29...

Страница 30: ...Main Parts View 30...

Страница 31: ...31 Air Valve Parts List...

Страница 32: ...For Parts or Service Contact BendPak Inc Ranger Products 1645 Lemonwood Dr Santa Paula CA 93060 Tel 1 805 933 9970 Toll Free 1 800 253 2363 Fax 1 805 933 9160 www bendpak com www rangerproducts com...

Отзывы: