15
STEP 7
( Routing Air Lines )
Connect the Air Safety Cylinders to the Air Safety Valve using the Tee Fitting and the Airline.
Route the air line as shown below making sure to position the push button air valve with the INLET facing towards the
AIR SOURCE and the OUTLET facing towards the lift.
A filter/regulator/lubricator must be installed on air supply at lift. Failure to do so will void the warranty. Cut the
provided 1/4” air line tubing with a sharp blade to lengths as required. Tubing must be cut square with no burrs.
Note: To assemble air line tubing into fitting, use firm, manual pressure to push tubing into the fitting until it bottoms out.
To remove air line tubing from the fitting, hold push sleeve in (against fitting) and, at the same time, pull out on tubing.
Pay careful attention to keep air line clear of any pinch points. Improper assembly may result in safety lock failure.
AIR PRESSURE SHOULD BE REGULATED TO 125 PSI MAX.
(See Fig. 7.1)
Fig. 7.1
Содержание BendPak P-6
Страница 9: ...9 P 6 P 6F Main Assembly Views...
Страница 22: ...22...
Страница 23: ...23...
Страница 29: ...29...
Страница 30: ...Main Parts View 30...
Страница 31: ...31 Air Valve Parts List...