17
STEP 10
( Lift Start Up / Final Adjustments )
1. Make sure the power unit reservoir is full with 12
quarts of 10-WT hydraulic oil or Dexron-III automatic
transmission fluid.
2. Test the power unit by pressing the push-button switch.
If the motor sounds like it is operating properly, raise the
lift and check all hose connections for leaks. If the motor
gets hot or sounds peculiar, stop and check all electrical
connections.
3.
RAISE LIFT UNTIL THE CYLINDER BOTTOMS OUT
AND THE LIFT STOPS.
4. Check all MAIN SAFETY LOCKS to make sure they
move freely and fall back to the lock position when
released. Lubricate all SAFETY PIVOT points with WD-40
or equal.
KEEP HANDS AND FEET CLEAR
. Remove hands and
feet from any moving parts. Keep feet clear of lift when
lowering. Avoid pinch points.
5. Run the lift up and down a few times to insure that the
locks are engaging uniformly and that the safety release
mechanisms are functioning.
.
POST-INSTALLATION CHECK-OFF
Main Lift Assemblies Properly Shimmed And Stable
Anchor Bolts Tightened
Electric Power Supply Confirmed
Safety Locks Functioning Properly
Check For Hydraulic Leaks
Oil Level
Lubrication of Critical Components
Check For Overhead Obstructions
Runways Level
All Screws, Bolts, and Pins Secured
Surrounding Area Clean
Operation, Maintenance and Safety Manuals on Site.
VISUALLY CONFIRM THAT ALL PRIMARY
SAFETY LOCKS ARE ENGAGED BEFORE
ENTERING WORK AREA.
Suspension components us on this lift are
intended to raise and lower lift only and are
not meant to be load holding devices. Remain
clear of elevated lift unless visual confirma-
tion is made that all primary safety locks are
fully engaged and the lift is LOWERED onto
the safety locks, Refer to installation /operation
manual for proper safety lock procedures
and /or further instruction.
Fig. 10.1
Содержание BendPak P-6
Страница 9: ...9 P 6 P 6F Main Assembly Views...
Страница 22: ...22...
Страница 23: ...23...
Страница 29: ...29...
Страница 30: ...Main Parts View 30...
Страница 31: ...31 Air Valve Parts List...