Preparing for Use
R&S
®
SMBV100B
21
Getting Started 1423.1049.02 ─ 02
To shut down and turn off the R&S
SMBV100B
Risk of losing data
If you switch off the running instrument using the rear panel switch or by
disconnecting the power cord, the instrument loses its current settings. Fur-
thermore, program data can be lost.
Press the On/Standby key first to shut down the application properly.
1. Press the [On/Standby] key.
The current setup is saved, the operating system shuts down and sets the
instrument to standby state.
The [On/Standby] LED must be orange.
2. Turn off the main AC power switch at the rear panel of the R&S
SMBV100B
(position "0" (off)).
The instrument is no longer supplied with AC power.
Turning off the AC power
You can leave the AC power on permanently. Switching off is required only
if the instrument must be disconnected from all power supplies.
3.1.7
Functional Check
When the instrument is switched on, it automatically monitors the main functions.
A detected fault is indicated by an "Error" message displayed in the "Info" line of
the instrument together with a brief error description. For an in-depth identification
of the error, tap on the "Info" indication. In response, a description of the errors is
displayed. For more information, refer to the "Troubleshooting and Error Mes-
sages" section in the user manual.
In addition to the automatic monitoring, the R&S
SMBV100B offers the following
capabilities to assure correct functioning:
●
Internal adjustments
Select the "System Config > Setup > General > Internal Adjustments" to
access the dialog for performing and configuring the adjustments settings.
Putting into Operation
Содержание SMBV100B
Страница 1: ...R S SMBV100B Vector Signal Generator Getting Started Getting Started Version 02 1423104902 G a2...
Страница 8: ...Contents R S SMBV100B 6 Getting Started 1423 1049 02 02...
Страница 42: ...Instrument Tour R S SMBV100B 40 Getting Started 1423 1049 02 02 Rear Panel Tour...
Страница 66: ...Trying Out the Instrument R S SMBV100B 64 Getting Started 1423 1049 02 02 Generating an EUTRA LTE Signal...
Страница 72: ...System Overview R S SMBV100B 70 Getting Started 1423 1049 02 02 Applications Examples of the R S SMBV100B...
Страница 86: ...Instrument Control R S SMBV100B 84 Getting Started 1423 1049 02 02 Remote Operation over VNC...