Side
Panel
Preparation
1.
Install an 8” x 1” piece of damping material centered on the inside of the left panel.
2.
Install an 8” x 1” piece of damping material centered on the inside of the right panel.
————————————————————————————
Front
Panel
Preparation
The position of damping material for the front panel will vary depending upon the switches and
controls that you have chosen.
1.
Install the two remaining 2” x 2” pieces of damping material on the inside of the front
panel.
•
Position them evenly and you may wish to cut one or both pieces to provide a more even
distribution.
•
Make sure that there is at least
⅝
” between the damping material and either the top edge
or bottom edge of the panel.
2.
Install an 8-32 x ½” setscrew in each of the five holes. The screw should be snug but do
not over-tighten.
————————————————————————————
22
Содержание Premium Extreme RAKK dac
Страница 6: ...Document version history 64 5 ...
Страница 39: ... 38 ...
Страница 45: ... 44 ...
Страница 53: ...52 ...
Страница 54: ...53 ...
Страница 55: ...54 ...
Страница 56: ...55 ...
Страница 65: ...64 Document version history Version Description 1 0 Original document 1 1 change select wiring colors ...