51
ESP-LXD Controller
Calendar Day Off
You can schedule certain days of the year as Non-irrigation, such as
holidays when landscape may receive heavy use.
The ESP-LXD controller can be programmed to suspend irrigation on a
particular calendar date, up to 5 different days of the year.
b
b
NOTE:
Calendar Day Off dates can only be selected 365 days
in advance. Then once a Calendar Day Off has passed, it will
be removed from the list and must be reprogrammed for the
following year if desired.
b
g
Turn the controller dial to Delay Watering.
A
The Delay Watering screen appears. Press the Down Arrow button
to select Calendar Day Off; then press Next.
B
The Calendar Day off screen appears, showing (up to 5) scheduled
calendar days off in chronological order. Unprogrammed days will
show as Unused.
1
2
C
Press the + and – buttons to set the Calendar Day Off date as
desired. Press the Next and Back buttons to select other days as
desired.
b
l
Press and HOLD buttons to accelerate settings for dates.
3
b
b
NOTE:
Calendar Day Off affects ALL programs and stations,
including non-irrigation stations. Consider not using this feature
if any of your programs include essential functions such as door
locks or sports field lighting.
Содержание ESP-LXD
Страница 1: ...ESP LXD Controller Installation Programming Operation Guide...
Страница 6: ...this page intentionally left blank...
Страница 34: ...28 ESP LXD Controller this page intentionally left blank...
Страница 45: ...39 ESP LXD Controller this page intentionally left blank...
Страница 52: ...46 ESP LXD Controller this page intentionally left blank...
Страница 82: ...76 ESP LXD Controller this page intentionally left blank...
Страница 104: ...98 ESP LXD Controller this page intentionally left blank...
Страница 115: ...109 ESP LXD Controller this page intentionally left blank...
Страница 134: ...128 ESP LXD Controller this page intentionally left blank...