Страница 1: ...Use and maintenance manual www raimondiutensili it BIBULLDOG ADV...

Страница 2: ...___________________________________________________________________________ 18 44 3 CHAPTER 4 USE OFTHE COMMANDS 4 1 ADJUSTING THE GRINDING WHEEL FOR HALF ROUND SHAPING _______________________________...

Страница 3: ...iples for design Technical principles EN 294 Safety of machinery Safety distances to prevent danger zones being reached by the upper limbs EN 418 Emergency stop equipment EN 349 Safety of machinery Mi...

Страница 4: ...complying with the specifications of RAIMONDI S p A if purchased or not supplied by RAIMONDI S p A if manufactured by it as well as improper use of the machine will make the warranty null and void Res...

Страница 5: ...NG WITH THE IDENTIFICATION PLATE IS STRICTLY FORBIDDEN 1 4 Intervention request Technical Service Each intervention request to the Technical Service shall be sent by fax to RAIMONDI S p A Technical Se...

Страница 6: ...r shall be familiar with the function and position of the STOP and START buttons 11 Replace parts deemed to be broken with original spare parts warranted by the manufacturing company 12 Never try reck...

Страница 7: ...nsidered as a safety component 2 3 Correct use of the machine BIBULLDOG ADV profiling machine is suitable for profiling edges on single and double fired ceramic tiles porcelain gres marble natural sto...

Страница 8: ...16 mm 8 10 15 20 30 HALF BULLNOSE GRINDING inches 5 16 3 8 19 32 25 32 1 3 16 FINISHING mm 8 10 15 20 30 BULLNOSE POLISHING inches 5 16 3 8 19 32 25 32 1 3 16 V 45 JOLLY CUT BEVELLING MITERING 45 mm H...

Страница 9: ...ays effective The groups are 1 Motor group On which the grinding wheel is positioned It is equipped with adjustment knobs and handles 2 Cooling group It allows for the constant supply of cooling water...

Страница 10: ...N EXCLUSIVELYWHENTHE OPERATOR IS INTHEWORKING POSITION THE MACHINE SHALL BETURNED OFF ATTHE END OF EACH CUTTING OPERATION GETTINGTHE HANDS CLOSETOTHE GRINDINGWHEELWHILE IT IS RUNNING IS STRICTLY FORBI...

Страница 11: ...red in such a way as to reduce at source the machine noise level Obviously sound pressure varies in relation to the type of blade its wear status and the material to be cut hence we have made a series...

Страница 12: ...ects generated by vibrations In any case these are associated to relevant factors such as the type of material to be cut and wear of the disc The results of the measurements carried out in the field i...

Страница 13: ...e fragmentation for material positioning and removal thereof once split up shall be taken into account RAIMONDI S p A believes BIBULLDOG ADV shall be included in the group of machines not exceeding th...

Страница 14: ...METAL DRUMS 2 12 CE Manufacturer s declaration DIRECTIVE 2002 95 EC RoHS Directive of the European Parliament and of the Council of 27 January 2003 on the restriction of the use of certain hazardous s...

Страница 15: ...iutensili it Use and Maintenance Manual Page 15 44 3 3 1 Packing transport Transport shall be made using a fork lift truck inserting the forks into the specific seats of the pallet Use a lift truck ha...

Страница 16: ...do not connect the machine Connect the machine to a 16A socket THE USE OF EXCESSIVELY LONG PATCH CORDS OR POWER SUPPLYWITH CURRENT GENERATORS MIGHT LEADTOTHE FOLLOWINGTROUBLES 1 SLOW STARTING OFTHE MO...

Страница 17: ...d parts MAKE SURETHETOOLBOX HAS BEEN FIXED CORRECTLY Free the front legs by completely unscrewing the leg fixing knobs A Go to the front side of the machine and lift it so that the leg goes past the l...

Страница 18: ...trolley from the machine Approach extensions to the frame fit screws A into their housigns and clamp not completely the nuts Mount on the extensions the supporting legs D and completely tighten screws...

Страница 19: ...11 2 2 chamfer and make sure the cut is as requested If necessary make any fine adjustments repeating the previously illustrated steps A B C D E H G C B Insert the wrench G in the nut for vertical adj...

Страница 20: ...using the knob M Block the motor group screwing again the B and C handles Reposition the spray guard A Perform a 4 5 cm 11 2 2 bevelling and if necessary perfect the adjustment using the knob M 45 jol...

Страница 21: ...displacing move the pins close to it E Block the material by means of B B1 B2 locking devices Trolley suitable for sizes exceeding 12 cm 4 22 32 of width Make sure the side of the material leaning on...

Страница 22: ...PEED DURING THE PROFILING SHALL BE PROPORTIONAL TO THE HARDNESS AND THICKNESS OFTHE MATERIALTO BE PROFILEDTO PREVENTTHE MATERIAL FROM DISPLACING AND TO AVOID A MOTOR OVERLOAD IFTHEPROFILINGPERFORMANCE...

Страница 23: ...stages of operation namely grinding and polishing To regenerate the grinding wheel profile contact an authorised dealer Grinding Finishing phase To grind finish the profile previously created with th...

Страница 24: ...emoval phase Suitable for Jolly cutting mitering 45 and bevelling 1 Adjust the position of the grinding wheel according to the quantity of material to remove 2 If the material is very hard or thick re...

Страница 25: ...2 The amount of material removed should not exceed 1 100 of mm 0 00004 inches 3 Cooling water must be clean Suspended dust resulting from the operations previously performed may damage the diamond be...

Страница 26: ...CASE A SINGLE TOOL IS TO BE USED THE SECOND TOOL HAS TO BE ADJUSTED TO PREVENT ITS INTERFERENCEWITHTHE MATERIALTO BE PROFILED B A Profiling To profile materials having high thickness or being very ha...

Страница 27: ...41100 Modena Italia Tel 39 059 280 888 Fax 39 059 282 808 www raimondiutensili it e mail raiutens raimondiutensili it Use and Maintenance Manual Page 27 44 4 Possible combinations POLISHING GR 1800 PO...

Страница 28: ...the two machines and by means of the adjustable feet C make them reach the same height until the two previously inserted tubular junctions A are in line with the slots B1 of the second machine Fit the...

Страница 29: ...er in the point where the flange chuck come into contact the vertical adjustment guide 5 2 Tank emptying and cleaning Place a bucket underneath the tank close to the drain hole Remove the plug A and l...

Страница 30: ...excessive clearance proceed as follows TO CARRY OUT THIS OPERATION WEAR THE PROTECTIVE GLOVES AND ACCIDENT PREVENTION SHOES Insert the trolley A on the guides Position the striker E on the trolley su...

Страница 31: ...E GLOVES AND ACCIDENT PREVENTION SHOES Remove the plastic spray guard A Open the tank door B Insert the B8 hexagon wrench stem E in the relevant seat manually turning the grinding wheel to help the cl...

Страница 32: ...arter restoring the connections in the motor terminal board and paying attention not to crush the wires 5 4 1 Sharpening the grinding wheel TO CARRY OUT THIS OPERATION WEAR THE PROTECTIVE GLOVES AND A...

Страница 33: ...p replacement AFTERTHE REPLACEMENT MAKE SURETHE CONNECTIONS INTHETERMINAL BOARD HAVE BEEN MADE CORRECTLY TO CARRY OUT THIS OPERATION WEAR THE PROTECTIVE GLOVES AND ACCIDENT PREVENTION SHOES FORTHIS OP...

Страница 34: ...ing screws A Disconnect the electric cables and replace the on off switch or the damaged thermal relay B Reconnect the cables and tighten with the previously removed screws Make sure the seal gasket C...

Страница 35: ...2 sizes To profile large sized materials or to improve the firmness of the material on the trolley set squares for 80 x 60 cm 31 1 2 x 23 20 32 or 120 x 60 cm 47 1 4 x 23 20 32 are provided according...

Страница 36: ...nger than 10 mt 33 The conductors section is undersized Frictions in the drive Contact the authorized technical service centre or the retailer Drive noise The bearings are damaged Contact the authoriz...

Страница 37: ...V V V Chapter 8 Spare parts and electric diagram Raimondi S p a Via dei Tipografi 11 41100 Modena Italia Tel 39 059 280 888 Fax 39 059 282 808 www raimondiutensili it e mail raiutens raimondiutensili...

Страница 38: ...E03D LEFT HEXAGONAL NUT 8 202FC01D DRAWERLOCK 9 202FG02D LEGS STOP 10 202PP03D PUMP HOLDER 11 235BU04A 230V 50HZTR 12A STARTER 11 235BU05A 110V 50 60HZTR 20A STARTER 11 235BU06A 230V 60HZTR 15A STARTE...

Страница 39: ...39 059 280 888 Fax 39 059 282 808 www raimondiutensili it e mail raiutens raimondiutensili it Use and Maintenance Manual Page 39 44 8 1 32 2 12 10 21 13 3 4 36 30 15 11 33 38 37 17 27 16 20 34 25 26...

Страница 40: ...325VT01D2 FRAME TANK 28 427GR BULL ADV BI BULL MOTOR GROUP 29 428GR BI BULL MOTOR GROUP 29 297IN86D MOT 1 1KW 1 5HP 230V 50 60HZ 29 297IN86D60H MOT 1 1KW 1 5HP 230V 60HZ 29 297IN86D 110 MOT 1 1KW 1 5...

Страница 41: ...39 059 280 888 Fax 39 059 282 808 www raimondiutensili it e mail raiutens raimondiutensili it Use and Maintenance Manual Page 41 44 8 1 32 2 12 10 21 13 3 4 36 30 15 11 33 38 37 17 27 16 20 34 25 26...

Страница 42: ...A B C D E F U A B C D E F 230V 50 60 Hz 110V 50 60 Hz A 3G 1 5H 07 RNF 3G 2 5H 07 RNF B 9 11 A 17 21 A C F 1 A x2 F 2 A x2 D SINGLE PHASE SINGLE PHASE 230V 50 60Hz 1 1 kW x2 110V 50 60Hz 1 1 kW x2 9...

Страница 43: ...280 888 Fax 39 059 282 808 www raimondiutensili it e mail raiutens raimondiutensili it Use and Maintenance Manual Page 43 44 Warranty certificate Via dei Tipografi 11 41100 MODENA Italy TO BE FRANKED...

Страница 44: ...d void if the B part is not entirely filled in and if sent later than 10 days after the date of purchase postmark date 4 By warranty we mean replacement or repair free of charge of components found to...