6.6
Notes on UPS Coordination and Automatic Running
Pay attention to the AC power-off sequence when using ESMPRO or NX UPS.
AC power-off sequence
(1) Business server
(2) FC switch
(3) Disk array unit (including extended BBU)
(4) Disk enclosure
(5) Management server (ESMPRO only)
There is no designated AC power-off sequence for multiple disk enclosures.
(1)
Business server
UPS (With SNMP card)
ESMPRO/AC
(2)
FC switch
UPS (With SNMP card)
UPS (With SNMP card)
(3)
Disk array unit
UPS (With SNMP card)
Extended BBU
UPS (With SNMP card)
(4)
Disk enclosure
UPS (With SNMP card)
UPS (With SNMP card)
(5)
Management server
(AC Server)
UPS (With SNMP card)
ESMPRO/AC
-
57
-
Содержание Xanadu
Страница 16: ...Power Supply Controller xv...
Страница 17: ...Battery xvi...
Страница 18: ...Disk Enclosure xvii...
Страница 19: ...Extended Battery Backup Unit Extended Battery Backup Unit Power Supply xviii...
Страница 26: ...This page is intentionally left blank...
Страница 31: ...This page is intentionally left blank 8...
Страница 53: ...4 Close the lever Close the lever all the way 5 The installation task is complete Close the lever Complete 30...