SECTION 14: O
PERATION
59
14.2 Testin
g
Establish that a satisfactory p
u
rged gas s
u
pply and an
electrical s
u
pply is a
v
ailable to the heater. Ens
u
re that all
time clocks and thermostats are set to call for heat.
With the gas s
u
pply c
u
t off at the appliance isolating cock
and the electrical s
u
pply isolated by s
w
itching off at the
local s
w
itch and remo
v
ing the appliance inlet pl
u
g, open
the control chamber sec
u
red by the t
w
o scre
w
s. Loosen
the sealing scre
w
from the press
u
re test point and
remo
v
e the co
v
er cap from the go
v
ernor.
T
u
rn on the gas s
u
pply and connect appliance electrical
pl
u
g. Ens
u
re that the timer or thermostat, if fitted, are set
to call for f
u
ll gas rate. S
w
itch on at the local s
w
itch. The
seq
u
ence as described sho
u
ld take place. If not, refer to
detailed fa
u
lt finding seq
u
ence. When flame is
established, check the gas press
u
re reading and adj
u
st if
necessary. Refer to b
u
rner data label.
Check the gas press
u
re at the o
u
tlet of the gas
v
al
v
e.
See
Page 73, Section 18.9.1
or
See Page 74, Section 18.9.2
for press
u
re settings or refer to the data plate.
S
w
itch off the electrical s
u
pply (sh
u
tting do
w
n the heater),
remo
v
e press
u
re ga
u
ge - tighten press
u
re test point
scre
w
, ens
u
ring a tight gas seal. Replace go
v
ernor co
v
er
cap. Close b
u
rner side co
v
er.
14.3 Commissionin
g
(Multiburner)
1. Establish that a satisfactory p
u
rged gas s
u
pply and
an electrical s
u
pply is a
v
ailable to the heater.
2. ENSURE that all the dampers are in the f
u
lly open
position.
3. With the gas s
u
pply off at each of the b
u
rners and
the electrical s
u
pply isolated, open the control
chamber sec
u
red by t
w
o self tapping scre
w
s.
4. Ens
u
re that all time clocks and thermostats are set
to call for heat.
5. S
w
itch on the electrical s
u
pply at the main isolator.
This
w
ill start the exha
u
st fan.
6.
Balancin
g
Cold Suction
Check each b
u
rner
v
ac
uu
m by connecting an
inclined press
u
re ga
u
ge to the tee on the press
u
re
s
w
itch inlet side in the b
u
rner. Adj
u
st the damper so
that the s
u
ction is 1.9 mbar. Repeat for each b
u
rner.
7. Starting at the end b
u
rner (f
u
rthest from the exha
u
st
fan),
w
ith the inclined press
u
re ga
u
ge connected as
described abo
v
e. T
u
rn on the gas s
u
pply and con-
nect appliance electrical pl
u
g, reset the press
u
re
s
w
itch by remo
v
ing s
u
ction from the inlet side of the
press
u
re s
w
itch
w
aiting se
v
eral seconds and recon-
necting. The start
u
p seq
u
ence described on
Page
58, Section 14
sho
u
ld take place. If not, refer to
detailed fa
u
lt finding seq
u
ence. When flame is
established, check the gas press
u
re reading and
adj
u
st if necessary. See data label.
Check the gas press
u
re at the o
u
tlet of the gas
v
al
v
e.
See Page 73, Section 18.9.1
or
See Page 74,
Section 18.9.2
for press
u
re settings or refer to the
data plate.
S
w
itch off the electrical s
u
pply (sh
u
tting do
w
n the
heater), remo
v
e press
u
re ga
u
ge - refit press
u
re
testpoint scre
w
, ens
u
ring a tight gas seal. Replace
go
v
ernor co
v
er cap.
Repeat this proced
u
re for each b
u
rner in the sys-
tem.
Close the control chamber and sec
u
re
w
ith t
w
o
sheet metal scre
w
s.
8.
Balancin
g
Hot Suction
Reconnect all the b
u
rners on the system and allo
w
them to reach f
u
ll operating temperat
u
re (approxi-
mately 20 min
u
tes). Ret
u
rn to each b
u
rner and
recheck the hot s
u
ctions at the tee on the inlet to the
press
u
re s
w
itch. Readj
u
st the damper so that the
hot s
u
ction of 1.5 mbar (2.0 mbar for BH40EF) is
achie
v
ed and lock the damper in position.
14.4 System Checks
S
w
itch on again at the local s
w
itch to ens
u
re smooth
ignition. Carry o
u
t the follo
w
ing system checks:
When r
u
nning, t
u
rn off the gas s
u
pply at the appliance.
The heater
w
ill immediately sh
u
t do
w
n follo
w
ed by three
ignition attempts follo
w
ed by locko
u
t.
Linear and Do
u
ble Linear only:
When r
u
nning, disconnect the fan pl
u
g from the b
u
rner.
The
u
nit sho
u
ld sh
u
t do
w
n
w
ithin three seconds, pro
v
ing
operation of the press
u
re s
w
itch.
14.5 User Instructions
After satisfactory testing, ens
u
re that the client is f
u
lly
a
w
are of the operation of the system. Bring this man
u
al to
the attention of the
u
ser or p
u
rchaser; instr
u
ct them in the
safe operation of the heater(s). Ad
v
ise the
u
ser that if the
system is
u
nfl
u
ed, any red
u
ction in the nat
u
ral
v
entilation
of the b
u
ilding may req
u
ire a fl
u
e to be fitted, or additional
v
entilation grilles
w
ill be req
u
ired.
Содержание BH15UT
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 33: ...SECTION 7 U TUBE HEATER INSTALLATION 27 Figure 23 U Tube Assembly Overview mm 200...
Страница 55: ...SECTION 10 OPTIONAL HEATER ACCESSORIES 49 Figure 28 U Tube Angle Mounted Figure 29 Linear...
Страница 71: ...SECTION 16 TROUBLESHOOTING 65 Troubleshooting Flow Chart Linear Double Linear and U Tube...
Страница 73: ...SECTION 16 TROUBLESHOOTING 67 Troubleshooting Flow Chart Multiburner...
Страница 81: ......