RADIANT SERVICES™ I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
26
*PVC coating must be removed prior to installation.
**Some models may receive S-hooks (P/N 91907302) or
spring hooks (P/N 91903300), rather than bow shackles
Part No.
Description
BH
15
UT
BH
20
UT
BH
25
UT
BH
25
UT
/E
F
BH
30
UT
BH
30
UT
/E
F
BH
35
UT
BH
35
UT
/E
F
BH
40
UT
BH
40
UT
/E
F
BH
45
UT
BH
45
UT
/E
F
BH
50
UT
BH
50
UT
/E
F
94320812
Screw #8 x 3/4 (3.9mm x 19mm), (goes with 03050000)
4
8
8
8
8
8
12
12
S7199K
Damper Flange Assembly (For use on Multiburner Systems)
1 Per Heater
Содержание BH15UT
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 33: ...SECTION 7 U TUBE HEATER INSTALLATION 27 Figure 23 U Tube Assembly Overview mm 200...
Страница 55: ...SECTION 10 OPTIONAL HEATER ACCESSORIES 49 Figure 28 U Tube Angle Mounted Figure 29 Linear...
Страница 71: ...SECTION 16 TROUBLESHOOTING 65 Troubleshooting Flow Chart Linear Double Linear and U Tube...
Страница 73: ...SECTION 16 TROUBLESHOOTING 67 Troubleshooting Flow Chart Multiburner...
Страница 81: ......