slope is within the port or starboard swath coverage. There will be a poor definition of the slope
covered by the nadir beams, as they act similar to a single beam echo sounder.
In setting up the survey lines, if the lines were to run up and downslope, the spacing would have to
vary between the start and the end of the lines, as the swath coverage would vary due to the
change in water depth. The lines would not be parallel. By surveying along the contours, the depths
will remain more or less constant so that the spacing does not have to change from beginning to
end. However, the spacing between adjoining lines may vary due to increased or decreased depth.
9.2.3
Line Run-in
As was previously noted, it is good survey practice to allow the motion sensor and gyro time to
settle after making a turn. With this in mind, the surveyor should set up the survey lines so that an
adequate lead-in, before the start of data recording, is allowed.
Extra lead in time allows the helmsman the opportunity to get on to the line and make any
adjustments that are necessary to counteract wind or current conditions. It is much better for the
vessel to be a little off of the planned survey line, but heading in a straight direction, rather than
‘fish-tailing’ back on forth across the line, trying to maintain zero offline.
Surveying into a beach may only allow very limited run-in if the lines are also to be surveyed out
from the beach. In this case, it may be better to design the lines so that they run parallel to the
beach. Of course, if it shallows greatly towards the beach, the lines should be run parallel to this
slope anyway as detailed above.
9.3
Record Keeping
It is essential that detailed records be kept of all aspects of the multibeam survey. The logging of all
details of the survey will greatly assist those in charge of processing the data. Maintaining a vessel
log, that reflects offsets, draft measurements, sound velocity profiles, etc.; will give the surveyor a
reference that can be easily accessed. The more information that is logged, the easier it will be
during processing, and it will also provide the surveyor with a means to assess survey technique with
a view to improving the efficiency of the survey.
9.3.1
Vessel Record
A hardbound ledger book should be kept for the vessel record. The vessel record should include,
but is not limited to:
•
Diagram of the vessel with measurements
•
All offsets
•
Daily draft measurements
•
Diary of sound velocity profiles
•
Surveyors / Operators
•
Equipment list
•
Equipment interface information
•
Diary reflecting dates of individual surveys
Содержание 2026
Страница 2: ...Page 2 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 14: ...Page 14 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 22: ...Page 22 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 28: ...Page 28 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 32: ...Page 32 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 39: ...Page 39 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 24 Projector cable clamp bolt mounting arrangement...
Страница 48: ...Page 48 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 55: ...Page 55 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 42 Projector cable as of 17 March 2022...
Страница 56: ...Page 56 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 116: ...Page 116 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 120: ...Page 120 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 122: ...Page 122 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 131: ...Page 131 of 254 Version 6 3 Rev r012 Date 05 11 2022...
Страница 138: ...Page 138 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 158: ...Figure 174 Smooth log information copied from a real time survey log...
Страница 182: ...Page 182 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 198: ...Page 198 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 210: ...Page 210 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 234: ...Page 234 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Страница 237: ...Page 237 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 215 Sonic 2026 Projector...
Страница 241: ...Page 241 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 219 Sonic 2022 Receiver Projector horizontal offset...
Страница 242: ...Page 242 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 220 Sonic 2024 Mounting Bracket Drawing...
Страница 243: ...Page 243 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 221 Sonic 2022 Mounting Bracket Drawing...
Страница 244: ...Page 244 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 222 Sonic 2026 Mounting Bracket Drawing...
Страница 245: ...Page 245 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 223 Sonic 2024 2022 Mounting Bracket Flange...
Страница 246: ...Page 246 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 224 SIM Box Drawing...
Страница 247: ...Page 247 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 225 SIM Stack Outline...
Страница 249: ...Page 249 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 227 Locking Ring type Deck Lead...
Страница 250: ...Page 250 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 228 I2NS Type 42 IMU Dimensions...
Страница 251: ...Page 251 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 229 I2NS Type 82 IMU offsets...
Страница 252: ...Page 252 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 230 I2NS IMU Cable...
Страница 253: ...Page 253 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 231 I2NS SIM Dimensions...
Страница 254: ...Page 254 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001 Figure 232 Dual Head Mount Offsets...