49
Step 2.
a) Fully lift your tailgate.
The Docking Station will be
fully assembled and secured
in position by your engineer,
you should still carry out a
few safety checks yourself
on a daily basis to ensure
the Docking Station is still
secure.
b) Release the locking latch
and at the same time, slowly
pull the ramps approximately
5cm or 2 inches away from
the Docking Station.
c) Now grip both the left and
right green ramp handles
and fully extend the ramps.
Two sets of OK labels will be
displayed when fully
extended.
When lowering the ramp sections to the floor you can use the ‘assisting cane’ to avoid
bending over (see page 39).
ALWAYS use both hands to hold the green handles when sliding the
ramp sections in and out.
Содержание Flyte
Страница 36: ...36 Part 2 Quingo Docking Station...
Страница 77: ......
Страница 78: ...For Customer Services call 01582 430900 QuingoFlyte DockingStation USER GUIDE DVD...