38
Step 2- Slide out the docking
station ramps.
a) Fully lift your tailgate.
The Docking Station will
be fully assembled and
secured in position by
your engineer, you
should still carry out a
few safety checks
yourself on a daily basis
to ensure the Docking
Station is still secure.
b) Release the locking
latch and at the same
time, slowly pull the
ramps approximately
5cm or 2 inches away
from the docking
station.
c) Now grip both the left
and right green ramp
handles and fully
extend the ramps. Two
sets of OK labels will be
displayed when fully
extended. Lower the
ramps to the floor- you
can use the assisting
cane to avoid bending
(see page 39).
ALWAYS use both hands to hold the green handles when sliding the ramp
sections in and out.
Содержание Flyte
Страница 36: ...36 Part 2 Quingo Docking Station...
Страница 77: ......
Страница 78: ...For Customer Services call 01582 430900 QuingoFlyte DockingStation USER GUIDE DVD...