Section VI - Adjustments and servicing procedures
39
Air filter
Oil top-up
Cleaning motor fan and vent holes
Before carrying out any maintenance, repair work or adjustment,
Stop the pump, close the isolation valve and wait for 3
minutes.
Press the emergency stop button and switch off the voltage.
Depressurize the pump by venting the process side of the
pump, if it is safe to do so.
Open and lock the isolating switch.
Lock the air inlet valve during maintenance or repair.
The operator must apply all relevant safety precautions
Before carrying out any adjustments on the pump, the first action
that must be taken is isolating the pump from the customer’s
network.
Air filter
Air filter provided with over pressure pump only.
Reference
Description
1
Air filter
Содержание QCV 045
Страница 2: ...This page intentionally left blank...
Страница 21: ...Section III Installation 21 Dimension drawing QCV 045 QCV 90 vacuum pump...
Страница 22: ...Section III Installation 22 Dimension drawing QCV 220 vacuum pump...
Страница 23: ...Section III Installation 23 Dimension drawing QCLP 90 Overpressure pumps...
Страница 24: ...Section III Installation 24 Dimension drawing QCLP 220 Overpressure pump...
Страница 55: ...Notes 55...
Страница 56: ...E mail info quincycompressor com 2016 Quincy Compressor Website www quincycompressor com All Rights Reserved...