3
E
N
G
L
I
S
H
Intended use
The
Quiko
device can be installed:
-
For civil and industrial use
-
Indoors in dry locations
-
To aid the passage of persons or things even where the automation undergoes
heavy duty use.
-
For the movement of sliding doors with frames in wood, aluminium, iron,
glass, PVC.
Assembly safety
Assembly must be carried out in compliance with good standards of installation in
observance of safe practices. Installation, testing, maintenance and repair may only be
carried out by authorized technicians from Quiko .
Any damage caused by haphazard, improper, unauthorized modifications relieve Quiko of
any responsibility
During installation and maintenance, be sure to mark off and protect the workplace.
Only a qualified electrician may connect the system to the 230 V mains.
For proper long-lasting operation of the automation, and to ensure guarantee coverage and
safety (as required by standards, use only original spare parts from
Quiko.
Always make sure you disconnect the 220V electrical power supply and the 12V battery
connections before doing any work on the internal parts of the automation.
Make sure you lock the cover guard or any other moving parts in place to keep them from
moving or falling.
Upon completion of installation, the technician must evaluate the risks concerning safety
standards (cuts, crushing, dragging, blows, hooking).
The automations must undergo periodic maintenance at least once a year.
Safety instructions
Comply with local instructions, standards and guidelines.
Also comply with the most recent version of the following standards:
-
prEN 12650-1
Requirements and test methods for automated pedestrian
closings
- prEN
12650-2
(Instructions
for)
safety for automated pedestrian closings
-
EN 60335-1
(Instructions for) safety of electrical devices for household use
and
similar
use;
general
requirements
- 46/90
Standards
for
system
safety
-
626/94 and 96
General instructions for health and safety of workers in the
workplace
-
528/99
Minimum requirements for health and safety of workers
in temporary and mobile worksites
Содержание WINNY LIGHT
Страница 5: ...5 E N G L I S H 4 SPACE REQUIRED VERTICAL SECTION ...
Страница 6: ...6 VERTICAL SECTION WITH CRASH BAR ...
Страница 7: ...7 E N G L I S H VERTICAL SECTION WITH COMMERCIAL PROFILES COMMERCIAL PROFILE COMMERCIAL PROFILE ...
Страница 27: ...27 E N G L I S H ...
Страница 28: ......
Страница 29: ...I T A L I A N O manuale d u s o e m a n u t e n z i o n e AUTOMAZIONE PER PORTE SCORREVOLI Winny ...
Страница 33: ...5 I T A L I A N O 4 SPAZI RICHIESTI ...
Страница 34: ...6 ...
Страница 35: ...7 I T A L I A N O ...
Страница 55: ...27 I T A L I A N O ...