Section 1 – Upper Frame Assembly
Parts List
Bag 1
Main-shaft Bearing Block X 2
M3x10 Self Tapping Screws x 16
M3x6 x 12
Radio Tray x 1
Lower Frame x 1
Rubber U-Channel x 2
Fuel Tank x 1
32mm Canopy Standoffs x 4
24mm Cross members x 2
Anti-rotation Guide x 1
Boom Halves x 2
M3x35 Cap Head Bolts x 4
M3 Locknut x 4
Frame Set Bag
Main Frames X 2
Cut the rubber U-channel to
55mm in length.
Locate the two main frames.
Install the rubber u-channel
onto both frame halves.