Install four canopy standoffs
(32mm) onto the two frame
halves.
Slide two frame halves over
fuel tank with canopy mounts
facing outward. The fuel tank
is on the front of the helicopter,
so looking from behind the
helicopter the open hole on the
tank goes out to the left.
Install upper and lower main
shaft bearing blocks using (8)
M3x6 cap head screws. Note:
Be sure that on the upper
bearing block the open half
faces up. The lower block the
open face should be down.