Note:
Controller port A2 and controller port B2 are reserved for mirror relationship
synchronization upon activation of the Synchronous Mirroring feature. In a four-host-port
system, controller port A4 and controller port B4 are reserved.
The primary site cabling is now complete.
10. Determine whether the secondary site cabling complete.
•
on page 116 for the secondary site.
•
on page 117.
11. Complete the fabric environment for switch 1 by connecting switch 1A to switch 1B.
The following figure shows the cabling that is described in Step
on
page 118.
3
2
5
4
7
6
9
8
11
10
12
13 15
14
1
0
Zone 2
Zone 1
17
16
19
18
21
20
23
22
25
24
27
26
29
28
31
30
Zone 1
Zone 2
17
16
19
18
21
20
23
22
25
24
27
26
29
28
31
30
Zone 1
Zone 2
3 5 7 9
13 15
2 4 6 8
11
10 12 14
1
0
Zone 2
Zone 1
84004-02
Zone 3
Zone 3
Zone 4
Zone 4
Zone 3
Zone 3
Zone 4
Zone 4
Switch 2A
Switch 2B
Fabric 2
10 km Maximum
Switch 1A
Switch 1B
Fabric 1
10 km Maximum
Hardware installation for Synchronous Mirroring and Asynchronous Mirroring | 117
Содержание StorNext QD7000
Страница 1: ...Hardware Cabling Guide StorNext QD7000 Firmware 8 40 xx xx 6 68683 01 Rev A...
Страница 7: ...Preface Hardware Cabling Guide vii...
Страница 10: ...E Series Hardware Cabling Guide December 2017 215 11792_B0 doccomments netapp com...
Страница 11: ......
Страница 90: ...One E5660 controller drive tray and one DE6600 drive tray Drive shelf or drive tray cabling 81...
Страница 106: ...One E2760 controller drive tray and one drive tray Drive shelf or drive tray cabling 97...