![Quantum StorNext QD7000 Скачать руководство пользователя страница 124](http://html2.mh-extra.com/html/quantum/stornext-qd7000/stornext-qd7000_hardware-manual_3493349124.webp)
Cabling for the highest availability campus configuration
After the four Fibre Channel switches are correctly zoned, set up the highest availability campus
configuration for the Synchronous Mirroring feature or the Asynchronous Mirroring feature.
About this task
Note:
Start the installation at the primary site. Repeat these steps for the secondary site when
instructed to do so.
After the four Fibre Channel switches are correctly zoned, set up the highest availability campus
configuration for the Synchronous Mirroring feature or the Asynchronous Mirroring feature.
Complete all connections by using Fibre Channel cables of the correct length.
Steps
1. Determine whether you adding equipment to an existing storage array environment.
•
If so, stop I/O activity from all hosts before proceeding. Go to Step
on page 115.
•
If not, the storage array installation is new. Go to Step
Attention:
Possible hardware damage – DC-powered controller-drive trays have special
power procedures that you
must follow beyond the procedures for AC-powered trays. To get
specific power-off and power-on procedures, refer to the installation instructions for your
storage array.
2. Turn off the power to all storage arrays, hosts, Fibre Channel switches, and any other equipment
in the storage array environment.
3. Make sure that cabling between all of the controller-drive trays and the drive trays is complete.
Example
Note:
Depending on which site is being configured, switch 1 represents switch 1A for the
primary site and switch 1B for the secondary site. This representation applies to switch 2 as
well.
4. Connect the primary host bus adapter for each local host to an available port in zone 1 of switch
1.
The following figure shows the cabling that is described in Step
on page 115 and Step
on page
116.
Hardware installation for Synchronous Mirroring and Asynchronous Mirroring | 115
Содержание StorNext QD7000
Страница 1: ...Hardware Cabling Guide StorNext QD7000 Firmware 8 40 xx xx 6 68683 01 Rev A...
Страница 7: ...Preface Hardware Cabling Guide vii...
Страница 10: ...E Series Hardware Cabling Guide December 2017 215 11792_B0 doccomments netapp com...
Страница 11: ......
Страница 90: ...One E5660 controller drive tray and one DE6600 drive tray Drive shelf or drive tray cabling 81...
Страница 106: ...One E2760 controller drive tray and one drive tray Drive shelf or drive tray cabling 97...