Immersion heater installation and wiring instructions 

 
a)

 

Ensure the mains voltage corresponds to the voltage rating of the immersion heater as shown 
on the rating label on the terminal cover. 

b)

 

Install the immersion heater into the domestic hot water cylinder using the gasket provided. 
Use a shaped spanner, Stillsons should not be used. The use of sealing compound is not 
recommended. 

c)

 

Wire the immersion heater in accordance with the wiring diagram below. It should be wired 
through a double pole isolator switch or controller, having contact separation of at least 3 
mm, using 1.5mm sq. flexible cable, 85 deg C rubber insulated HOFR sheathed, to comply 
with BS 6141 table 8 and must be fully earthed. 

d)

 

The BEAB approval certification on this immersion heater only applies if rod type 
thermostats, types Sunvic VKL or Cotherm SHD are used. The temperature setting of the 
control thermostat must not exceed 60 deg C. 

e)

 

In the event of the manual reset cut-out operating, isolate the immersion heater from the 
mains supply, investigate and identify the cause of the operation of this cut-out, rectify the 
fault before manually resetting the cut-out via the reset button on the cut-out. Finally switch 
the mains electricity supply back on. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fig 7

 

 
 
 
 

WARNING: THIS APPLIANCE MUST BE EARTHED. 

 
 
 
 
 
 

Содержание Hot Spring

Страница 1: ...Storage Capacities 90 125 150 170 200 250 and 300 Litres Hot Spring Installation User and Service Manual Domestic Hot Water Cylinder...

Страница 2: ...12 User instructions 20 13 Warranty 20 1 Introduction The Quantum Hot Spring is a high quality stainless steel domestic hot water cylinder suitable for use on unvented or open vented hot water systems...

Страница 3: ...3 Performance Hot water generation time in minutes from 26 36 37 36 33 35 40 15 to 65 degrees C for Indirect cylinder Hot water generation time in minutes from 52 72 86 98 108 144 202 15 to 65 degrees...

Страница 4: ...e is 12 bar 4 4 Taps and fittings All taps and fittings incorporated in the unvented system should have a rated operating pressure of 7 bar or above 4 5 Location The unit is designed to be floor stand...

Страница 5: ...5 Pipework connections Fig 1 KEY ITEM DESCRIPTION A TEMPERAURE AND PRESSURE RELIEF VALVE B HOT WATER C HEATING WATER RETURN D THERMOSTAT POCKET E COLD WATER F IMMERSION HEATER G HEATING WATER FLOW...

Страница 6: ...er demand before switching over on to central heating duty If an existing system is a flow share arrangement such as a Honeywell S or Y plan type system see Figs 3 and 4 they will also provide satisfa...

Страница 7: ...7 W Plan wiring layout and system schematic...

Страница 8: ...8 Fig 2 Y Plan wiring layout and system schematic...

Страница 9: ...9 Fig 3 S Plan wiring layout and system schematic Fig 4...

Страница 10: ...torage volumes up to and including 200 litres For cylinders of 250 and 300 litres capacity a separate 24 litre expansion vessel is supplied which MUST be connected into the cold water supply side betw...

Страница 11: ...VALVE SET 6 BAR 6 DISCHARGE PIPE 22mm DIA SEE SECTION 7 7 DRAIN COCK 8 IMMERSION HEATER 230v 3 Kw 50 Hz 9 COLD WATER INLET CONNECTION 22mm DIA 10 PRIMARY FLOW CONNECTION 22mm DIA 11 CONTROL THERMOSTAT...

Страница 12: ...Downward discharge at low level i e up to 100 mm above external surfaces such as car parks hard standings grassed areas etc are acceptable providing that where children play or otherwise come into co...

Страница 13: ...13 Typical discharge pipe arrangement Fig 6...

Страница 14: ...Worked example The example below is for a diameter temperature relief valve with a discharge pipe D2 having 4 No elbows and a length of 7 m from the tundish to the point of discharge From Maximum res...

Страница 15: ...mit trip is factory set at 85 C The immersion heater conforms with EEC Directive 76 889 for radio interference and complies with BS 800 1977 WARNING Never fit an immersion heater without a thermal cut...

Страница 16: ...ontact separation of at least 3 mm using 1 5mm sq flexible cable 85 deg C rubber insulated HOFR sheathed to comply with BS 6141 table 8 and must be fully earthed d The BEAB approval certification on t...

Страница 17: ...the valve seating and to prove the correct function of the discharge arrangement 9 4 Check all joints for leaks rectify as necessary 9 5 Check that the control and high limit settings for the indirect...

Страница 18: ...e PRV Check the strainer and if necessary remove any debris from in front of it Replace the cartridge 10 8 Check the charge pressure in the expansion vessel and top up as necessary The charge pressure...

Страница 19: ...ult your boiler manufacturers instructions 3 High limit thermostat has 3 Check and re set tripped 4 Motorised valve malfunction 4 Check wiring and or plumbing connections to motorised valve Intermitte...

Страница 20: ...ols supplied with the cylinder for a period of 2 years from the date of purchase provided that they have been installed for their intended use by a competent person and have not been modified in any w...

Отзывы: