Quantum|ATL 7100 Series Facilities Planning and Installation Guide
vii
Figures
Left Panel Removed............................................................ 2
Library Numbering Conventions (100 cartridges.......... 4
Library Numbering Conventions (68 Cartridges) ......... 5
Library AC Power Receptacle ........................................... 9
Library Unloading Space Requirements ....................... 12
Removing the Box from the Pallet.................................. 14
Unpacking the Library ..................................................... 15
Extension Axis Tie-Wraps ............................................... 19
Packing Block Locations .................................................. 20
Figure 10 Power Receptacle and Power Switch Location ............ 27
Figure 11 Connecting the SCSI Cables (two-wire, four drives)... 31
Figure 12 SCSI Cabling Block Diagram (2 drives, 1 wire)............ 36
Figure 13 SCSI Cabling Block Diagram (4 drives, 2 wires) .......... 38
Figure 14 SCSI Cabling Block Diagram (7 drives, 4 wires) .......... 40
Содержание ATL 7100
Страница 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Страница 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...