Chapter 2 Unpacking and Moving the Library
Packaging the Library for Reshipment
22
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
11
Roll the library onto the pallet and into the shipping bag.
12
Seal the shipping bag by folding the seam over and taping the
edge.
13
Install the stop block in front of library front casters (see
14
Install the foam cap on the library and install accessory tray.
15
Wrap the box around the library and pallet and install the four
plastic retaining clips (refer to
16
Install steel banding to secure the library and packing material
to the pallet.
Caution:
It is recommended that the steel bands be
tightened to approximately 200 lb. of tension
prior to shipment.
Содержание ATL 7100
Страница 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Страница 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...