Chapter 1 Library Specifications and Site Requirements
Site Requirements
8
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Table 4 Library Floor
Space Requirements
Floor Leveling
1
The floor must be level to within 1/4” over a 6' x 6' area.
Floor Loading
1
A standard raised computer floor rated at 250 lb./ft
2
is sufficient to
support a fully loaded library.
Floor Clearance
1
The cabinet has a nominal floor clearance of 0.75" (1.9cm).
Power
1
The library’s auto-ranging motor and logic power supplies will
accept single phase, 90-264VAC input power at 47-63 Hz.
36.5”
24”
Library
(Ramp side/off-load area)
(For maintenance only)
(For maintenance only)
(M
aint
enanc
e ar
ea)
25”
25”
96”
25”
157.5”
74”
Front of library
V
ent
ilat
ion and
c
abli
n
g
Содержание ATL 7100
Страница 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Страница 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...