
Chapter 2 Unpacking and Moving the Library
Removing the Protective Packaging Material
20
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Figure 9 Packing
Block Locations
Storing the
Packaging
Material
2
To store packaging material:
1
Slide the two pallet ramp sections into their shipping position
in the pallet.
2
Collapse the cardboard box.
3
Store the box, molded top, pallet and all other packing material
for possible later use.
Gripper block
Vertical axis
block
Bottom
horizontal
block
Top
horizontal
block
Содержание ATL 7100
Страница 1: ...Quantum ATL 7100 Series Facilities Planning and Installation Guide 6241101 02 Ver 2 Rel 2...
Страница 6: ...Contents vi Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 8: ...Figures viii Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 10: ...Tables x Quantum ATL 7100 Series Facilities Planning and Installation Guide...
Страница 16: ...3UHIDFH YL 4XDQWXP_ 7 6HULHV DFLOLWLHV 3ODQQLQJ DQG QVWDOODWLRQ XLGH...