13
STEP 4: INSTALLING ROPE ORGANIZER FOR RAFTERS (Side to Side)
A. Center one side of rope orginizer plate onto riser board and mark mounting hole location with pencil.
Drill two 5/32” mounting holes.
Rope Pulley Mounting Board
Rope Pulley Mounting Board
B. Assemble rope orginizer using plate and pulleys supplied in kit. Fasten to 2” x 6” riser board with with two
1/4” x 2 ½” lag bolts and 1/4” washers. Do not overtighten bolts. Rope orginizer pulleys will need to turn freely.
If overtightened hoist will not operate properly.
Содержание Quadratop 12020-2000
Страница 20: ...Instructions Part 12999 3307...